Loading...
HomeMy WebLinkAboutTerracon - 1/14/2019 (2)CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0578 Service Date: 12/06/18 2501 E Loop 820 N Report Date: 01/14/19 Revision 1 - 28 -day results Fort Worth, TX 76118-6978 Task: Parking Garage 817-268-8600 Reg No: F-3272 Client Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Material Information Specified Strength: 4,000 psi @ Mix ID: 40U500BG Supplier: BURNCO Batch Time: 1100 Truck No.: 1015 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Laboratory Test Data Project Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Sample Information 28 days Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Plant: 506 Ticket No.: 50602159 Result Specification 5 3-5 5.1 3-6 51 60 146.8 Set Specimen Avg Diam. Area No. ID (in) (sq in) 1 A 4.00 12.57 1 B 4.00 12.57 1 C 4.00 12.57 1 D 4.00 12.57 Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: Age at Maximum Date Date Test Load Received Tested (days) (lbs) 12/13/18 7 40,180 01/03/19 28 59,260 01/03/19 28 57,380 01/03/19 28 56,990 Average (28 days) 12/06/18 Sample Time: 1215 Kristopher McGarry Overcast, low wind 10/90 Batch Size (cy): 10 Pump 0 0 Paving for firelane, 25'E and 15'N of NWC multi-level parking Paving firelane N of grid line P 1 from NWC to NEC of muti-level parking Compressive Strength Fracture Tested (psi) Type By 3,200 5 4,720 3 4,570 4 4,540 2 4,610 1 E Hold Initial Cure: Outside Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Kristopher McGarry Reported To: David Saiter w/ Manhattan Contractor: Report Distribution: See attached distribution list. Reviewed By: _ �, lupa Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR000t, u -16-t2, Rev.6 Page 1 of 1 Distribution Page Irerracon Report Number: 95181011.0578 Service Date: 12/06/18 2501 E Loop 820 N Report Date: 01/14/19 Revision 1 - 28 -day results Fort Worth, TX 76118-6978 Task: Parking Garage 817-268-8600 Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) City of Grapevine TX, Hans Strayer (1) City of Grapevine TX, Paul M Lee (1) City of Grapevine TX, Scott Williams (1) City of Grapevine TX, sbatte@grapevinetexas.gov (1) JQ Engineering, Mike Oler (1) Manhattan Construction Company, Ben Jensen (1) Manhattan Construction Company, Chase Pritchard (1) Manhattan Construction Company, Daniel Rideau (1) Manhattan Construction Company, David Saiter (1) Manhattan Construction Company, Frederick Moore (1) Manhattan Construction Company, Klint Robertson (1) Manhattan Construction Company, Matthew Powell (1) Manhattan Construction Company, Robert Montgomery (1) Walker Consultants, Martha M. Villanueva