HomeMy WebLinkAboutTerracon - 1/8/2019CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0580
Service Date: 12/10/18 2501 E Loop 820 N
Report Date: 01/08/19 Revision 2 - 28 -day results Fort Worth, TX 76118-6978
Task: Parking Garage 817-268-8600 Reg No: F-3272
Client
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Material Information
Specified Strength: 5,000 psi @
Mix ID:
9727
Supplier:
Argos
Batch Time:
1327
Truck No.:
7102
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Project
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Sample Information
28 days Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Plant:
123
Placement Method:
Ticket No.:
12335177
Water Added Before (gal):
ID
(in)
Water Added After (gal):
Received
1
Sample Location:
Result
Specification
12/11/18
7
5-7
Placement Location:
5.5
3-6
1
62
50-95
12.57
65
1
D
43.6
Set
Specimen
Avg Diam.
Area
Date
No.
ID
(in)
(sq in)
Received
1
A
4.00
12.57
12/11/18
1
B
4.00
12.57
12/11/18
1
C
4.00
12.57
12/11/18
1
D
4.00
12.57
12/11/18
12/10/18 Sample Time: 1400
Daniel Blocker
Clear
6 Batch Size (cy): 6
Bucket
Garage Bumper Walls, Level 6, Grid
Line P2.2 -P3/15, P7 -P9/15, P6 -P8/18
Garage Columns, Level 6, Grid Line
P13/15, P13/15.3, P13/17.6; Garage
Bumper Walls, Level 6, Grid Line
P2.2-P3/15,P7-P9/15, P6 -P8/18
1 E 12/11/18 Hold
Initial Cure: Outside Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Daniel Blocker
Reported To:
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By: _
�, lupa
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cR000t, u -16-t2, Rev.6 Page 1 of 1
Age at
Maximum
Compressive
Date
Test
Load
Strength
Fracture Tested
Tested
(days)
(lbs)
(psi)
Type By
12/17/18
7
53,300
4,240
4
01/07/19
28
67,800
5,400
4
01/07/19
28
68,230
5,430
5
01/07/19
28
69,660
5,540
3
Average
(28 days)
5,460
1 E 12/11/18 Hold
Initial Cure: Outside Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Daniel Blocker
Reported To:
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By: _
�, lupa
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cR000t, u -16-t2, Rev.6 Page 1 of 1
Distribution Page Irerracon
Report Number: 95181011.0580
Service Date: 12/10/18 2501 E Loop 820 N
Report Date: 01/08/19 Revision 2 - 28 -day results Fort Worth, TX 76118-6978
Task: Parking Garage 817-268-8600
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) City of Grapevine TX, Hans Strayer
(1) City of Grapevine TX, Paul M Lee
(1) City of Grapevine TX, Scott Williams
(1) City of Grapevine TX, sbatte@grapevinetexas.gov
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Company, Ben Jensen
(1) Manhattan Construction Company, Chase Pritchard
(1) Manhattan Construction Company, Daniel Rideau
(1) Manhattan Construction Company, David Saiter
(1) Manhattan Construction Company, Frederick Moore
(1) Manhattan Construction Company, Klint Robertson
(1) Manhattan Construction Company, Matthew Powell
(1) Manhattan Construction Company, Robert Montgomery
(1) Walker Consultants, Martha M. Villanueva