HomeMy WebLinkAboutTerracon - 1/9/2019 (2)CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0582
Service Date: 12/11/18 2501 E Loop 820 N
Report Date: 01/09/19 Revision 2 - 28 -day results Fort Worth, TX 76118-6978
Task: Parkine Garace 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID: 9041
Supplier: Argos
Batch Time: 1200 Plant: 123
Truck No.: 5114 Ticket No.: 12335222
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Result
Specification
8 1/2
5-9
6.0
3-6
57
50-95
50
1
144.0
4.00
Set Specimen Avg Diam.
No.
ID
(in)
1
A
4.00
1
B
4.00
1
C
4.00
1
D
4.00
1
E
4.00
1 F
Initial Cure: Outside
Area
(sq in)
12.57
12.57
12.57
12.57
12.57
Date
Received
12/12/18
12/12/18
12/12/18
12/12/18
12/12/18
Date
Tested
12/17/18
12/18/18
01/08/19
01/08/19
01/08/19
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
12/12/18
Final Cure: Moist Room
Age at
Maximum
Test
Load
(days)
(lbs)
6
64,780
7
71,500
28
83,180
28
86,460
28
83,800
Average
(28 days)
Hold
12/11/18 Sample Time:
Daniel Blocker
Clear
6 Batch Size (cy):
Pump
0
0
Pour Strip, Grid Line P7.5/15.2
Level 4, Pour Strips, Grid Line
P7.5/15-16, P7.5/16-17
Compressive
Strength
(psi)
Comments: Average compressive strength of 28 day cylinders complies with the specified strength.
5,160
5,690
6,620
6,880
6,670
6,720
Fracture
Type
2
5
4
5
4
1300
6
Tested
By
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Daniel Blocker
Reported To:
Contractor: Manhattan
Report Distribution:
See attached distribution list.
Reviewed By: _
�, lupa
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR000t, u -16-t2, Rev.6 Page 1 of 1
Distribution Page Irerracon
Report Number: 95181011.0582
Service Date: 12/11/18 2501 E Loop 820 N
Report Date: 01/09/19 Revision 2 - 28 -day results Fort Worth, TX 76118-6978
Task: Parking Garage 817-268-8600
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) City of Grapevine TX, Hans Strayer
(1) City of Grapevine TX, Paul M Lee
(1) City of Grapevine TX, Scott Williams
(1) City of Grapevine TX, sbatte@grapevinetexas.gov
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Company, Ben Jensen
(1) Manhattan Construction Company, Chase Pritchard
(1) Manhattan Construction Company, Daniel Rideau
(1) Manhattan Construction Company, David Saiter
(1) Manhattan Construction Company, Frederick Moore
(1) Manhattan Construction Company, Klint Robertson
(1) Manhattan Construction Company, Matthew Powell
(1) Manhattan Construction Company, Robert Montgomery
(1) Walker Consultants, Martha M. Villanueva