Loading...
HomeMy WebLinkAboutAlpha Testing - 12/13/20171 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct. 30 20 20 -1.10 40.60 39.43 Dry 42.18 DryDry -1.10 11.50 18.33 9.42 20.08 9.42 39.50 21.00 41.08 28.00 20.00 38.33 18.00 40.42 9.42 approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016) 599.60 598.50 PB-32 18 18 PB-26 599.60 598.50 599.60 598.50 599.60 PB-25 Geotechnical Engineering | Construction Materials Testing | Environmental Engineering Depth From Top Of Concrete To Bottom Of Pier (ft.) Measured Depth From Ground Level To Top Of Concrete (ft.) Top of Pier Elevation (ft.) Depth of Bearing Stratum From Ground (ft.) 598.50 PB-31 18 Project: Client: General Contractor: Kasten, Brian Grapevine-Colleyville ISD 3051 Ira E. Woods Avenue Grapevine, Texas 76051 Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Drilled Straight Shaft Pier Observation Report Mustang Panther Stadium Service Date: Technician: 12/13/2017 12/15/2017 Clear Report Date: Weather: Work Order Number: Project Number:F171917 336979 Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written Condition of Bottom (Wet or Dry) Pier Identification Pier Diameter (in.) Actual Penetration (ft.) Top of Ground Elevation (ft.) Casing Diameter (in.) Cased Depth (ft.) Total Depth of Drilled Pier From Ground (ft.) Required Penetration (ft.) Vertical Bar Size (#)7 7 18 Tim Begole Sr. Building B New Star DrillingLee Lewis Building/Structure Identification Drilling Contractor: Remarks: 9.42 22.42 -1.10 41.52 20 Dry 20 30 -1.10 7 3030 7 6 Length of Vertical Bars (ft.)44.33 43.33 44.42 45.42 Number of Vertical Bars (each)6 6 6 Stirrup Size (#)3 3 3 3 Stirrup Spacing (in.)12 12 12 12 Time Drilling Was Completed 9:35 AM 10:00 AM 10:20 AM 9:15 AM Page Number:1 of 1Grapevine, Texas Time Concrete Was Placed 1:00 PM 1:15 PM 12:40 PM 1:30 PM Respectfully Submitted, Yes Yes YesConcrete Placed Same Day (Yes or No)Yes