Loading...
HomeMy WebLinkAboutAlpha Testing - 5/8/2018Mortar Cubes Made Grout Prisms Made Drawings Utilized: Ɣ Ɣ Water Lime Water Ɣ Plan Sheet: Detail Sheet: Lime Gravel Amount Sand Type Cement TypeMaterialSource/Manufacturer Gravel Cement Masonry Prisms Made Material Wet Dry N/A Sand Mortar (If Applicable) CMU Blocks Source/ManufacturerMaterial Amount XSand Gravel Cement X Type of Mixer for Mortar (If Applicable): X Method of Mixing Materials Grout (If Applicable) X Bond Beam/Lintel Grouted X Lime Mixing of Materials Reinforcing Steel Ties X Storage of Materials X Type of Mixer for Grout (If Applicable): Reinforcing Steel Splices X Reinforcing Steel Size X Reinforcing Steel Spacing X Bond Beam/Lintel Location X Geotechnical Engineering | Construction Materials Testing | Environmental Engineering Project: Report Date: Weather: 394213 F171917 1 of 1 Technician: Work Order Number: Project Number: 79°FCourses:24th to 29th Grapevine, Texas Page Number: Not CorrectCorrectItem Observed Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Masonry Observation Report Item ObservedCorrect 5/14/2018 Gasigwa, Ignace(Baziga) Ambient Temp.: Date: Grapevine - Colleyville ISD 30510 Ira E Woods Ave Grapevine, TX 76051 Client: General Location: General Information S5.1; S5.2; S7.1 Not Correct 05/08/2018 X Reinforcing Steel Embedment Mustang Panther Stadium Pkg A & Pkg B Service Date: S4.1 Partly Cloudy Reinforcement Observation N/A approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-013(8/2/2016) 5/17/2017 N/A Reinforcing Steel Placement Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written X Bond Beam/Lintel Reinforcement X Wall Openings X Tim Begole Sr. Remarks: Concessions Building B Restroom Bond Beam; Westside and Eastside CMU Walls Respectfully Submitted,