Loading...
HomeMy WebLinkAboutAlpha Testing - 3/12/2018Geotechnical Engineering | Construction Materials Testing | Environmental Engineering Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016) Tim Begole Sr. Respectfully Submitted, X Based on the representative's visual observation using the provided project plans, the area was compliant Cable/Tendon Drape X Sheathing The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office. Remarks: X Correct Splicing X PT Drawings X Cable/Tendon Count & Spacing Stirrup Size XGrade Beam / Column Size X Stirrup Spacing Proper Placement X Number of Reinforcement X Dowels in Place XBar Length & Spacing X XReinforcement Tied Properly X Proper Support X Form Clean X Reinforcement Clean XGrade Reinforcement X Size of Reinforcement X Drawings Approved X Proper Cover X Observation Information Item Observed CorrectNot Correct N/A Item Observed Correct Not Correct N/A •Date:5/17/2017 •Plan Sheet:S2.4 •Detail Sheet: Technician:Abima, Cornelius Reinforcement note on the foundation plan (No.3 at 1 '-0") The representative observed the reinforcing steel related items for the following area: •Slab-on-Deck: Building C The representative utilized the following provided project plans to perform the observation: An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled. 1 of 1Grapevine, Texas Page Number: 30510 Ira E Woods Ave Report Date:3/19/2018 Grapevine, TX 76051 Weather:Clear Work Order Number:369602 Project:Mustang Panther Stadium Pkg A & Pkg B Project Number:F171917 Client:Grapevine - Colleyville ISD Service Date:03/12/2018 Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Reinforcing Steel Observation Report