March 12, 2019
Grapevine- Colleyville ISD
30510 Ira E Woods Ave
Grapevine, TX 76051
Attention: Ms. Calva Powell
Re: Testing Summary Letter
Mustang Panther Stadium
Package B - Press Box
Grapevine, Texas
ALPHA Report No. F171917-529785
As requested, we are providing this letter as a summary of the testing and observations performed for the
referenced project. Reports documenting the observations and testing for this project were issued soon
after work was completed.
At intervals scheduled by the contractor, Alpha Testing, Inc. representatives observed and tested the
following project elements:
• Subgrade preparation and compaction in building pad areas;
• Trench backfill and compaction for underground utilities;
• Steel reinforcing placement in drilled shaft foundations, grade beams, floor slabs and masonry walls;
• Concrete strength for drilled shaft foundations, grade beams and floor slabs;
• Grout strength for masonry walls;
• Structural steel welded and bolted connections.
Based on the results of our field and laboratory observations and tests, the project elements observed and
tested by Alpha were found to be in general compliance with the plans and specifications for the project.
We are pleased to be of service on this project. If you have any questions, please contact our office.
Sincerely yours,
OF TEx�\\I ALPHA ESTING, INC.,
®,�P,.• .S 11
............M�'C,KELSEY ..F
. J E i Jeromi C. Kelsey, P.E.
00�0'0�. 31�92� cv�,� Project Engineer