Loading...
HomeMy WebLinkAboutAlpha Testing - 3/12/2019 ALPHA / TESTING 5058 Brush Creek Road Fort Worth,Texas 76119 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 March 12, 2019 Grapevine- Colleyville ISD 30510 Ira E Woods Ave Grapevine, TX 76051 Attention: Ms. Calva Powell Re: Testing Summary Letter Mustang Panther Stadium Package B - Press Box Grapevine, Texas ALPHA Report No. F171917-529785 As requested, we are providing this letter as a summary of the testing and observations performed for the referenced project. Reports documenting the observations and testing for this project were issued soon after work was completed. At intervals scheduled by the contractor, Alpha Testing, Inc. representatives observed and tested the following project elements: • Subgrade preparation and compaction in building pad areas; • Trench backfill and compaction for underground utilities; • Steel reinforcing placement in drilled shaft foundations, grade beams, floor slabs and masonry walls; • Concrete strength for drilled shaft foundations, grade beams and floor slabs; • Grout strength for masonry walls; • Structural steel welded and bolted connections. Based on the results of our field and laboratory observations and tests, the project elements observed and tested by Alpha were found to be in general compliance with the plans and specifications for the project. We are pleased to be of service on this project. If you have any questions, please contact our office. Sincerely yours, OF TEx�\\I ALPHA ESTING, INC., ®,�P,.• .S 11 ............M�'C,KELSEY ..F . J E i Jeromi C. Kelsey, P.E. 00�0'0�. 31�92� cv�,� Project Engineer