Loading...
HomeMy WebLinkAboutAlpha Testing - 3/13/2019 March 13, 2019 Ms. Calva Powell Grapevine - Colleyville ISD 3051 Ira E Woods Ave Grapevine, TX 76051 Re: Renovations To: Mustang Panther Stadium Package B Grapevine - Colleyville ISD Grapevine, TX Dear Ms. Calva Powell, Based on independent laboratory observation reports from ALPHA Testing and site observations by others on Huckabee’s Staff, I believe that the structural construction of the Mustang Panther Stadium, Package B – Press Box, generally conform with the structural documents issued by Huckabee & Associates, Inc. for the above referenced project. I am not aware of any outstanding structural issues. Sincerely, Brian Eilerts, P.E. Huckabee F-1252 Director of Structural Operations Enclosure: Testing Summary Letter – ALPHA Report No. F171917-529785 F-1252