Loading...
HomeMy WebLinkAboutAlpha Testing - 12/14/2017 (4)X X SheathingCable/Tendon Drape PT Drawings X Cable/Tendon Count & Spacing X X X X X Grade Beam / Column Size Dowels in Place N/ACorrectNot Correct Reinforcement Clean Form Clean Proper Cover Proper Support Number of Reinforcement X X X X X X Stirrup Spacing Not Correct Item Observed Stirrup Size Correct X X X Drawings Approved Grade Reinforcement Remarks: Based on the representative's visual observation using the provided project plans, the area was compliant Item Observed Respectfully Submitted, approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016) Tim Begole Sr. Mustang Panther Stadium Service Date:Client: The representative observed the reinforcing steel related items for the following area: An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled. Observation Information Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written Grapevine - Colleyville ISD 30510 Ira E Woods Ave Grapevine, TX 76051 12/14/2017 Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Reinforcing Steel Observation Report Geotechnical Engineering | Construction Materials Testing | Environmental Engineering NW Firelane South of Building B The representative utilized the following provided project plans to perform the observation: The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office. Work Order Number: Project Number: Report Date: Weather: Project: of 1 Clear 12/15/2017 F171917 Technician:Abima, Cornelius • • Detail Sheet:• Plan Sheet: Grapevine, Texas Page Number: 338112 1 Size of Reinforcement Bar Length & Spacing Proper Placement Reinforcement Tied Properly X Correct Splicing •Date: C0.5 Paving General Notes #8 4/10/2017 N/A X X