HomeMy WebLinkAboutAlpha Testing - 11/21/2017Plan Sheet: Based on the representative's visual observation using the provided project plans, the area was compliant RW1.1 RW1.5/1 5/17/2017 X X Size of Reinforcement N/A Partly Cloudy 11/29/2017 •Date: • • Detail Sheet:• The representative observed the reinforcing steel related items for the following areas: An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled. Grapevine, Texas Page Number: 329291 1 of 1 F171917 Technician:Moore, John Work Order Number: Project Number: Report Date: Weather: Project: Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Reinforcing Steel Observation Report Grapevine - Colleyville ISD 30510 Ira E Woods Ave Grapevine, TX 76051 Geotechnical Engineering | Construction Materials Testing | Environmental Engineering Retaining Wall Building C: Station 0+00 to 1+34.5 The representative utilized the following provided project plans to perform the observation: Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written 11/21/2017 Mustang Panther Stadium Item Observed Correct Splicing Service Date:Client: The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office. Observation Information approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016) Tim Begole Sr. Trash and missing chairs in placement-corrected. Respectfully Submitted, Remarks: Proper Placement Reinforcement Tied Properly X X Correct X X X Stirrup Size Reinforcement Clean Form Clean Stirrup Spacing Drawings Approved Grade Reinforcement Number of Reinforcement X X X X X Bar Length & Spacing N/ACorrectNot CorrectNot Correct Item Observed Grade Beam / Column Size Proper Cover Proper Support Dowels in Place X X X X X PT Drawings X Cable/Tendon Count & Spacing X Cable/Tendon Drape X Sheathing