Based on the representative's visual observation using the provided project plans, the area was compliant
RW1.1
RW1.5/1
5/17/2017
X
X
Size of Reinforcement
N/A
Partly Cloudy
11/29/2017
•Date:
•
•
Detail Sheet:•
The representative observed the reinforcing steel related items for the following areas:
An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Grapevine, Texas Page Number:
329291
1 of 1
F171917
Technician:Moore, John
Work Order Number:
Project Number:
Report Date:
Weather:
Project:
Alpha Testing, Inc.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.alphatesting.com
TBPE Firm No. 813
Reinforcing Steel
Observation Report
Grapevine - Colleyville ISD
30510 Ira E Woods Ave
Grapevine, TX 76051
Geotechnical Engineering | Construction Materials Testing | Environmental Engineering
Retaining Wall Building C: Station 0+00 to 1+34.5
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written
11/21/2017
Mustang Panther Stadium
Item Observed
Correct Splicing
Service Date:Client:
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Observation Information
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016)
Tim Begole Sr.
Trash and missing chairs in placement-corrected.
Respectfully Submitted,
Remarks:
Proper Placement
Reinforcement Tied Properly
X
X
Correct
X
X
X
Stirrup Size
Reinforcement Clean
Form Clean
Stirrup Spacing
Drawings Approved
Grade Reinforcement
Number of Reinforcement
X
X
X
X
X
Bar Length & Spacing
N/ACorrectNot CorrectNot Correct Item Observed
Grade Beam / Column Size
Proper Cover
Proper Support
Dowels in Place
X
X
X
X
X
PT Drawings X Cable/Tendon Count &
Spacing X
Cable/Tendon Drape X Sheathing