Loading...
HomeMy WebLinkAboutAlpha Testing - 12/1/2017 (3)Mustang Panther Stadium 4/10/2017 X X Size of Reinforcement N/A •Date: X X Stirrup Size Form Clean Dowels in Place Observation Information X X X 12/01/2017 The representative observed the reinforcing steel related items for the following area: Work Order Number: Project Number: Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Reinforcing Steel Observation Report Service Date:Client:Grapevine - Colleyville ISD 30510 Ira E Woods Ave Weather: Grapevine, Texas Page Number: 332901 1 of Report Date: Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written Project: Plan Sheet: 1 An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled. Clear 12/5/2017 F171917 Technician:Billingsley, Ernest (Alan) Grapevine, TX 76051 • •RW1.5 & RW1.7 Correct Not Correct Reinforcement Clean Geotechnical Engineering | Construction Materials Testing | Environmental Engineering Spread Footing for Retaining Wall: Stations 1+40 to 1+65 The representative utilized the following provided project plans to perform the observation: Detail Sheet:• N/ANot Correct Item ObservedCorrect X Proper SupportX Reinforcement Tied Properly Grade Reinforcement Number of Reinforcement X X approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016) Tim Begole Sr. Item Observed Bar Length & Spacing Proper Placement Proper Cover Stirrup Spacing X Drawings Approved X Correct Splicing Grade Beam / Column Size Remarks: The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office. Based on the representative's visual observation using the provided project plans, the area was compliant PT Drawings X Cable/Tendon Count & Spacing Cable/Tendon Drape X X Respectfully Submitted, Missing proper support - Corrected X X X X Sheathing