HomeMy WebLinkAboutAlpha Testing - 12/1/2017 (3)Mustang Panther Stadium
4/10/2017
X
X
Size of Reinforcement
N/A
•Date:
X
X
Stirrup Size
Form Clean
Dowels in Place
Observation Information
X
X
X
12/01/2017
The representative observed the reinforcing steel related items for the following area:
Work Order Number:
Project Number:
Alpha Testing, Inc.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.alphatesting.com
TBPE Firm No. 813
Reinforcing Steel
Observation Report
Service Date:Client:Grapevine - Colleyville ISD
30510 Ira E Woods Ave
Weather:
Grapevine, Texas Page Number:
332901
1 of
Report Date:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written
Project:
Plan Sheet:
1
An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Clear
12/5/2017
F171917
Technician:Billingsley, Ernest (Alan)
Grapevine, TX 76051
•
•RW1.5 & RW1.7
Correct Not Correct
Reinforcement Clean
Geotechnical Engineering | Construction Materials Testing | Environmental Engineering
Spread Footing for Retaining Wall: Stations 1+40 to 1+65
The representative utilized the following provided project plans to perform the observation:
Detail Sheet:•
N/ANot Correct Item ObservedCorrect
X
Proper SupportX
Reinforcement Tied Properly
Grade Reinforcement
Number of Reinforcement
X
X
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016)
Tim Begole Sr.
Item Observed
Bar Length & Spacing
Proper Placement
Proper Cover
Stirrup Spacing
X
Drawings Approved
X
Correct Splicing Grade Beam / Column Size
Remarks:
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Based on the representative's visual observation using the provided project plans, the area was compliant
PT Drawings X Cable/Tendon Count &
Spacing
Cable/Tendon Drape X X
Respectfully Submitted,
Missing proper support - Corrected
X
X
X
X
Sheathing