HomeMy WebLinkAboutAlpha Testing - 12/6/2017 (4)RW1.1, RW1.4, RW1.5, RW1.6, RW1.7
P9, P10 Date 10/07/2017
5/17/2017
N/A
•Date:
Size of Reinforcement
Bar Length & Spacing
Proper Placement
Reinforcement Tied Properly
X
•
•
•
Detail Sheet:•
Plan Sheet:
Grapevine, Texas Page Number:
334888
1 of 1
Cloudy
12/8/2017
The representative observed the reinforcing steel related items for the following area(s):
An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
F171917
Technician:Vyas, Darshan
Observation Information
Work Order Number:
Project Number:
Report Date:
Weather:
Mustang Panther StadiumProject:
Alpha Testing, Inc.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.alphatesting.com
TBPE Firm No. 813
Reinforcing Steel
Observation Report
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Geotechnical Engineering | Construction Materials Testing | Environmental Engineering
•
Section 2 Retaining wall from STA 10+40 to STA 30+45.
The representative utilized the following provided project plans to perform the observation:
Service Date:Client:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written
Grapevine - Colleyville ISD
30510 Ira E Woods Ave
Grapevine, TX 76051
12/06/2017
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016)
Tim Begole Sr.
Item Observed
Remarks:
Grade Reinforcement
Respectfully Submitted,
X
X
X
Correct Splicing
Correct
X
X
X
Drawings Approved
Not Correct Item Observed
Stirrup Size
Proper Cover
Proper Support
Number of Reinforcement
X
X
N/ACorrectNot Correct
Reinforcement Clean
Form Clean
Grade Beam / Column Size X
XDowels in Place
XStirrup Spacing
X
X
X
X
X
PT Drawings X Cable/Tendon Count &
Spacing X
Cable/Tendon Drape X
Based on the representative's visual observation using the provided project plans, the area
Sheathing
was compliant