Loading...
HomeMy WebLinkAboutAlpha Testing - 12/6/2017 (4)RW1.1, RW1.4, RW1.5, RW1.6, RW1.7 P9, P10 Date 10/07/2017 5/17/2017 N/A •Date: Size of Reinforcement Bar Length & Spacing Proper Placement Reinforcement Tied Properly X • • • Detail Sheet:• Plan Sheet: Grapevine, Texas Page Number: 334888 1 of 1 Cloudy 12/8/2017 The representative observed the reinforcing steel related items for the following area(s): An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled. F171917 Technician:Vyas, Darshan Observation Information Work Order Number: Project Number: Report Date: Weather: Mustang Panther StadiumProject: Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Reinforcing Steel Observation Report The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office. Geotechnical Engineering | Construction Materials Testing | Environmental Engineering • Section 2 Retaining wall from STA 10+40 to STA 30+45. The representative utilized the following provided project plans to perform the observation: Service Date:Client: Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written Grapevine - Colleyville ISD 30510 Ira E Woods Ave Grapevine, TX 76051 12/06/2017 approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016) Tim Begole Sr. Item Observed Remarks: Grade Reinforcement Respectfully Submitted, X X X Correct Splicing Correct X X X Drawings Approved Not Correct Item Observed Stirrup Size Proper Cover Proper Support Number of Reinforcement X X N/ACorrectNot Correct Reinforcement Clean Form Clean Grade Beam / Column Size X XDowels in Place XStirrup Spacing X X X X X PT Drawings X Cable/Tendon Count & Spacing X Cable/Tendon Drape X Based on the representative's visual observation using the provided project plans, the area Sheathing was compliant