Loading...
HomeMy WebLinkAboutAlpha Testing - 12/19/2018•Date: X X Not Correct Item Observed Drawings Approved X X Size of Reinforcement X Stirrup Spacing Stirrup Size Grapevine, Texas Page Number: 492904 1 of 1 Overcast 1/2/2019 F171917 Technician:Leonard, Terry 12/19/2019Service Date:Client:Grapevine - Colleyville ISD • • Project Number: • Plan Sheet:RW1.1 RW1.6 Project: Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Reinforcing Steel Observation Report Weather: Mustang Panther Stadium Pkg A & Pkg B Work Order Number: Geotechnical Engineering | Construction Materials Testing | Environmental Engineering The representative utilized the following provided project plans to perform the observation: Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written Report Date: Correct Splicing Correct X X X Detail Sheet: The representative observed the reinforcing steel related items for the following area: An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled. Based on the representative's visual observation using the provided project plans, the area X approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016) Tim Begole Sr. 30510 Ira E Woods Ave Grapevine, Texas 76051 Remarks: Item Observed X Retaining Wall: Footing and Wall 3A Proper Placement Reinforcement Tied Properly Observation Information The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office. was compliant 4/10/2017 N/A Respectfully Submitted, Grade Reinforcement Number of Reinforcement X Form Clean Bar Length & Spacing X N/ACorrectNot Correct Reinforcement Clean Proper Support X X Grade Beam / Column Size Proper Cover Dowels in Place X X X Cable/Tendon Drape X Sheathing X PT Drawings X Cable/Tendon Count & Spacing