HomeMy WebLinkAboutAlpha Testing - 12/19/2018•Date:
X
X
Not Correct Item Observed
Drawings Approved
X
X
Size of Reinforcement
X
Stirrup Spacing
Stirrup Size
Grapevine, Texas Page Number:
492904
1 of 1
Overcast
1/2/2019
F171917
Technician:Leonard, Terry
12/19/2019Service Date:Client:Grapevine - Colleyville ISD
•
•
Project Number:
•
Plan Sheet:RW1.1
RW1.6
Project:
Alpha Testing, Inc.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.alphatesting.com
TBPE Firm No. 813
Reinforcing Steel
Observation Report
Weather:
Mustang Panther Stadium Pkg A & Pkg B
Work Order Number:
Geotechnical Engineering | Construction Materials Testing | Environmental Engineering
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written
Report Date:
Correct Splicing
Correct
X
X
X
Detail Sheet:
The representative observed the reinforcing steel related items for the following area:
An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Based on the representative's visual observation using the provided project plans, the area
X
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016)
Tim Begole Sr.
30510 Ira E Woods Ave
Grapevine, Texas 76051
Remarks:
Item Observed
X
Retaining Wall: Footing and Wall 3A
Proper Placement
Reinforcement Tied Properly
Observation Information
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
was compliant
4/10/2017
N/A
Respectfully Submitted,
Grade Reinforcement
Number of Reinforcement
X
Form Clean
Bar Length & Spacing
X
N/ACorrectNot Correct
Reinforcement Clean
Proper Support
X
X
Grade Beam / Column Size
Proper Cover
Dowels in Place
X
X
X
Cable/Tendon Drape X Sheathing X
PT Drawings X Cable/Tendon Count &
Spacing