Loading...
HomeMy WebLinkAboutAlpha Testing - 12/20/2018Sheathing X PT Drawings X Cable/Tendon Count & Spacing X Dowels in Place X X X Form Clean Proper Cover Proper Support N/A Number of Reinforcement X X XCable/Tendon Drape Stirrup Size Grade Beam / Column Size X Stirrup Spacing Reinforcement clearance not correct - Corrected Respectfully Submitted, Remarks: approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016) Tim Begole Sr. Bar Length & Spacing The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office. Reinforcement Clean Geotechnical Engineering | Construction Materials Testing | Environmental Engineering Retaining Wall: Stations 00.00 and 68.75 The representative utilized the following provided project plans to perform the observation: Observation Information Proper Placement Reinforcement Tied Properly X Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written • • Detail Sheet:• Plan Sheet: 1 Clear 12/28/2018 The representative observed the reinforcing steel related items for the following area: An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled. F171917 Technician:Babek, Danny X X Size of Reinforcement Reinforcing Steel Observation Report Work Order Number: Project: Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Grapevine - Colleyville ISD 30510 Ira E Woods Ave Grapevine, TX 76051 Mustang Panther Stadium Pkg A & Pkg B of Correct X Based on the representative's visual observation using the provided project plans, the area was compliant X Correct Splicing Project Number: Report Date: Weather: X X Grapevine, Texas Page Number: 493958 1 12/20/2018Service Date:Client: P14 P14 10/30/2017•Date: Item Observed N/ACorrectNot Correct X X XDrawings Approved Grade Reinforcement Not Correct Item Observed