HomeMy WebLinkAboutAlpha Testing - 12/21/2018PT Drawings X Cable/Tendon Count &
Spacing
XCable/Tendon Drape Sheathing X
X
X
X
X
X
Grade Beam / Column Size
Proper Cover
Dowels in Place
N/A Correct Not Correct
Reinforcement Clean X
Not Correct Item Observed
Proper Support
Respectfully Submitted,
Remarks:
Item Observed
X
9/15/2017; 4/10/2017
X
Size of Reinforcement
•Date:
Drawings Approved
Proper Placement
Reinforcement Tied Properly
Grade Reinforcement
Number of Reinforcement
X
Form Clean
Bar Length & Spacing
Observation Information
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
was compliant
Stirrup Size
X
X
Stirrup Spacing
X
X
N/A
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016)
Tim Begole Sr.
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written
Geotechnical Engineering | Construction Materials Testing | Environmental Engineering
The representative utilized the following provided project plans to perform the observation:
Report Date:
Correct Splicing
Correct
X
X
X
An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Detail Sheet:
The representative observed the reinforcing steel related items for the following area:
Based on the representative's visual observation using the provided project plans, the area
X
Project:
Alpha Testing, Inc.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.alphatesting.com
TBPE Firm No. 813
Reinforcing Steel
Observation Report
Weather:
Mustang Panther Stadium Pkg A & Pkg B
Work Order Number:
30510 Ira E Woods Ave
Grapevine, Texas 76051
•
•
•
•
12/21/2019Service Date:Client:Grapevine - Colleyville ISD
F171917
Plan Sheet:RW1.14 (Footing); C6.1 (Paving
RW1.15 (Footing); C6.5 (Paving
Retaining Wall: Footing and Wall 12 at Station 0+00
Paving: Ramp leading Northern most Building of Statium Buildings
Clear
1/2/2019
Technician:Leonard, Terry
Project Number:
Grapevine, Texas Page Number:
494237
1 of 1