Loading...
HomeMy WebLinkAboutAlpha Testing - 1/7/2019X PT Drawings X Proper Cover Proper Support X X X Stirrup Size X X X Cable/Tendon Count & Spacing Respectfully Submitted, Geotechnical Engineering | Construction Materials Testing | Environmental Engineering • approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016) Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written Size of Reinforcement Correct Splicing Based on the representative's visual observation using the provided project plans, the area Bar Length & Spacing Proper Placement Reinforcement Tied Properly X Wall 11: Missing shear key - Corrected; A19Wall 13: Form was not placed correctly- corrected Number of Reinforcement Remarks: was compliant Grade Beam / Column Size X SheathingCable/Tendon Drape Wall 10 Wall 11 Wall 13 Observation Information X X X X Tim Begole Sr. Project: Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Reinforcing Steel Observation Report The representative observed the reinforcing steel related items for the following areas: An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled. 01/07/2019Service Date: Grapevine, TX 76051 Client:Grapevine - Colleyville ISD 30510 Ira E Woods Ave Work Order Number: Project Number: Report Date: Weather: Mustang Panther Stadium Pkg A & Pkg B Grapevine, Texas Page Number: 498140 1 of 1 Clear 1/16/2019 F171917 Technician:Guerrero, Victor The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office. Item Observed 9/15/2017 X Not Correct Item Observed • • N/ACorrectNot Correct Reinforcement Clean N/A •Plan Sheet: •Main Entrance Stairs Sides / Handrails (between walls 13 and 11) RW1.14 The representative utilized the following provided project plans to perform the observation: Form Clean Dowels in Place Stirrup Spacing RW1.16 / RW1.15 •Date: Detail Sheet:• Correct X X X Drawings Approved Grade Reinforcement X X