Loading...
HomeMy WebLinkAboutAlpha Testing - 10/1/20181 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 NaNaNaNaNaNa 18.00 N/A 18.00 N/A 15.00 Wet 18.00 15.00 15.00 15.00 Wet 15.00 Wet Wet Wet Wet N/A N/A N/A N/A 12.00 18.00 18.00 18.00 18.40 N/A 18.2012.30 18.60 18.00 20.50 N/A N/A N/AN/A N/A N/AN/A N/AN/AN/A 18 N/A N/A N/A N/A N/A 18 7 6 18 Building/Structure Identification 1 Light Pole Piers 3 Client: Condition of Bottom (Wet or Dry) General Contractor: Pier Identification Pier Diameter (in.) Top of Ground Elevation (ft.) Top of Pier Elevation (ft.) Depth of Bearing Stratum From Ground (ft.) Total Depth of Drilled Pier From Ground (ft.) Measured Depth From Ground Level To Top Of Concrete (ft.) Actual Penetration (ft.) 8 2 18 N/A N/A 5 Geotechnical Engineering | Construction Materials Testing | Environmental Engineering Project: Drilling Contractor: Cased Depth (ft.) Depth From Top Of Concrete To Bottom Of Pier (ft.) N/A Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Drilled Straight Shaft Pier Observation Report 15.00 18.10 18.00 N/A N/A 4 9 18 Required Depth (ft.) Casing Diameter (in.) N/A 2 18 N/A N/A 18 N/A 18 N/A N/AN/A N/A 18.00 18.20 13.00 Wet 15.00 Wet approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016) Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written Tim Begole Sr. NaNa Remarks: Na Respectfully Submitted, Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct. 7Vertical Bar Size (#)6 7 6666 77777 6 15.00 18.00 N/A 15.00 Number of Vertical Bars (each)8 6 Wet 7 NaNaNa Na Na NaNaNaNa Length of Vertical Bars (ft.)13.00 15.00 15.00 15.00 15.00 15.00 15.00 6 6 Stirrup Spacing (in.)12 12 12 12 12 12 12 2Stirrup Size (#)4 3 2 2 2 1:40 PM 1:50 PM 2:00 PM 1:10 PM 11:03 AM 2 15.00 2 2 12 12 Time Drilling Was Completed 8:25 AM 9:20 AM 9:09 AM 9:28 AM Time Concrete Was Placed 1:03 PM 1:10 PM 1:20 PM yes 1:20 PM Page Number: yes yes Scott, Clinton 1 Concrete Placed Same Day (Yes or No)yes yes yes Grapevine, Texas yes 1:30 PM 9:59 AM 10:24 AM 10:43 AM 11:30 AM yes yes 10/01/2018 10/3/2018 Clear 458701 of F171917 1 Technician: Service Date: Report Date: Weather: Work Order Number: Project Number:Mustang Panther Stadium Pkg A & Pkg B Grapevine - Colleyville ISD 30510 Ira E Woods Ave Grapevine, TX 76051