HomeMy WebLinkAboutAlpha Testing - 10/1/20181
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
NaNaNaNaNaNa
18.00
N/A
18.00
N/A
15.00
Wet
18.00
15.00 15.00 15.00
Wet
15.00
Wet Wet Wet Wet
N/A N/A N/A N/A
12.00 18.00 18.00 18.00
18.40
N/A
18.2012.30 18.60 18.00 20.50
N/A N/A N/AN/A
N/A
N/AN/A
N/AN/AN/A
18
N/A
N/A N/A N/A
N/A
18
7 6
18
Building/Structure Identification
1
Light Pole Piers
3
Client:
Condition of Bottom (Wet or Dry)
General Contractor:
Pier Identification
Pier Diameter (in.)
Top of Ground Elevation (ft.)
Top of Pier Elevation (ft.)
Depth of Bearing Stratum From
Ground (ft.)
Total Depth of Drilled Pier From
Ground (ft.)
Measured Depth From Ground
Level To Top Of Concrete (ft.)
Actual Penetration (ft.)
8
2 18
N/A N/A
5
Geotechnical Engineering | Construction Materials Testing | Environmental Engineering
Project:
Drilling Contractor:
Cased Depth (ft.)
Depth From Top Of Concrete To
Bottom Of Pier (ft.)
N/A
Alpha Testing, Inc.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.alphatesting.com
TBPE Firm No. 813
Drilled Straight Shaft Pier
Observation Report
15.00
18.10
18.00
N/A
N/A
4 9
18
Required Depth (ft.)
Casing Diameter (in.)
N/A
2
18
N/A
N/A
18
N/A
18
N/A
N/AN/A
N/A
18.00 18.20
13.00
Wet
15.00
Wet
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016)
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written
Tim Begole Sr.
NaNa
Remarks:
Na
Respectfully Submitted,
Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct.
7Vertical Bar Size (#)6 7
6666
77777
6
15.00
18.00
N/A
15.00
Number of Vertical Bars (each)8 6
Wet
7
NaNaNa
Na Na NaNaNaNa
Length of Vertical Bars (ft.)13.00 15.00 15.00 15.00 15.00 15.00 15.00
6 6
Stirrup Spacing (in.)12 12 12 12 12 12 12
2Stirrup Size (#)4 3 2 2 2
1:40 PM 1:50 PM 2:00 PM 1:10 PM
11:03 AM
2
15.00
2 2
12 12
Time Drilling Was Completed 8:25 AM 9:20 AM 9:09 AM 9:28 AM
Time Concrete Was Placed 1:03 PM 1:10 PM 1:20 PM
yes
1:20 PM
Page Number:
yes yes
Scott, Clinton
1
Concrete Placed Same Day (Yes or
No)yes yes yes
Grapevine, Texas
yes
1:30 PM
9:59 AM 10:24 AM 10:43 AM 11:30 AM
yes yes
10/01/2018
10/3/2018
Clear
458701
of
F171917
1
Technician:
Service Date:
Report Date:
Weather:
Work Order Number:
Project Number:Mustang Panther Stadium Pkg A & Pkg B
Grapevine - Colleyville ISD
30510 Ira E Woods Ave
Grapevine, TX 76051