Loading...
HomeMy WebLinkAboutAlpha Testing - 8/22/2018 (2)Serial No:Manufacturer: Remarks: Respectfully Submitted, Troxler Model:3440 approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016) Geotechnical Engineering | Construction Materials Testing | Environmental Engineering Tim Begole Sr. Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written This report is in general compliance with one or more of the following technical standards: D6938-15 Gauge Information Non-compliant results are indicated by an asterisk(*) if applicable. (D):1812 (M):644 100+ Standard Count: 16.51Retaining Wall 15, Station 0+30 FG-2.0 1 12 General Location Area:Retaining Wall Field Test Data Test No.Test Location Lift/ Depth Mat. No. Percent Compaction (%) 127.0 109.0 95-1 316.7 Percent Moisture (%) Probe Depth (in.) Wet Density (pcf) Dry Density (pcf) Compaction Min. (%) Max. Material Information Laboratory Data Mat. No. Optimum Moisture (%) Max Dry Weight (pcf) Proctor Report No. Moisture Min. (%) Max.Material Description/Classification 1of Project: 1 Project Specifications Guerrero, Victor 8/23/2018Report Date: Service Date:08/22/2018 Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 In-Place Nuclear Density Test Report Work Order Number: Mustang Panther Stadium Pkg A & Pkg B Project Number:F171917 Client:Grapevine - Colleyville ISD Clear 30510 Ira E Woods Ave Grapevine, TX 76051 Weather: 441847 Technician: Grapevine, Texas Page Number: 107.1Brown and Tan Sandy Clay31 12 4 Retaining Wall 4A, Station 0+30 FG 1 12 5 Retaining Wall 15, Station 0+30 FG 1 107.0 17.5 105.2 17.2 16.4 108.6 16.7 125.7 100+ 126.7 100+ 123.3 127.3 100 98 109.4 1 12 3 Retaining Wall 15, Station 0+30 FG-1.0 1 12 2 Retaining Wall 4A, Station 0+30 FG-1.0