HomeMy WebLinkAboutAlpha Testing - 1/10/2018 (3)X
X
SheathingCable/Tendon Drape
PT Drawings X Cable/Tendon Count &
Spacing
X
X
X
X
X
Grade Beam / Column Size
Dowels in Place
N/ACorrectNot Correct
Reinforcement Clean
Form Clean
Proper Cover
Proper Support
Number of Reinforcement
X
X
X
X
X
X
Stirrup Spacing
Not Correct Item Observed
Stirrup Size
Correct
X
X
X
Drawings Approved
Grade Reinforcement
Remarks:
Based on the representative's visual observation using the provided project plans, the area was compliant
Item Observed
Steel needed staightening - Corrected
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016)
Tim Begole Sr.
Mustang Panther Stadium
Service Date:Client:
The representative observed the reinforcing steel related items for the following area:
An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Observation Information
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written
Grapevine - Colleyville ISD
30510 Ira E Woods Ave
Grapevine, TX 76051
01/10/2018
Alpha Testing, Inc.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.alphatesting.com
TBPE Firm No. 813
Reinforcing Steel
Observation Report
Geotechnical Engineering | Construction Materials Testing | Environmental Engineering
North Water Line 1
The representative utilized the following provided project plans to perform the observation:
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Work Order Number:
Project Number:
Report Date:
Weather:
Project:
of 1
Mostly Cloudy
1/13/2018
F171917
Technician:Moore, John
•
•
Detail Sheet:•
Plan Sheet:
Grapevine, Texas Page Number:
345752
1
Size of Reinforcement
Bar Length & Spacing
Proper Placement
Reinforcement Tied Properly
X
Correct Splicing
•Date:
C0.5
Note 8
4/10/2017
N/A
X
X