Loading...
HomeMy WebLinkAboutAlpha Testing - 1/15/201817.6 97124.1 103.7 18.0 95 105.5 104.0 17.9 12 2 Retaining Wall 1, Station 1+20 FG-9.0 1 12 3 Retaining Wall 1, Station 1+20 95 122.4 122.61Retaining Wall 1, Station 1+20 FG-10.0 1 12 FG-8.0 1 Material Description/Classification Brown Clay Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 In-Place Nuclear Density Test Report 30510 Ira E Woods Ave Revised: Work Order Number: Client:Grapevine - Colleyville ISD Service Date:01/15/2018 347606 Project:Mustang Panther Stadium Project Number:F171917 1/19/2018 Grapevine, TX 76051 Weather:Overcast Page Number:1 Technician:Scott, Clinton of 1 15.5 109.1 Mat. No. Material Information Laboratory Data Optimum Moisture (%) Max Dry Weight (pcf) Proctor Report No. Project Specifications Grapevine, Texas 41 Moisture Min. (%) Max. Compaction Min. (%) Max. 982693 General Location Area:Retaining Wall Field Test Data Test No.Test Location Lift/ Depth Mat. No. Probe Depth (in.) Wet Density (pcf) Dry Density (pcf) Percent Moisture (%) Percent Compaction (%) Gauge Information Non-compliant results are indicated by an asterisk(*) if applicable. Serial No:30166 Manufacturer:CPN Standard Count:(D):30079 (M):9056 Remarks: Model: 5001P Geotechnical Engineering | Construction Materials Testing | Environmental Engineering This report is in general compliance with one or more of the following technical standards: D6938-15 Respectfully Submitted, Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016) Tim Begole Sr.