Loading...
HomeMy WebLinkAboutAlpha Testing - 1/25/2018 (3)This report is in general compliance with one or more of the following technical standards: D6938-15 Respectfully Submitted, Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016) Geotechnical Engineering | Construction Materials Testing | Environmental Engineering Tim Begole Sr. Standard Count:(D):1982 (M):628 Remarks: Model:3440Serial No:27934 Manufacturer:Troxler Gauge Information Non-compliant results are indicated by an asterisk(*) if applicable. Field Test Data Test No.Test Location Lift/ Depth Mat. No. Probe Depth (in.) Wet Density (pcf) Dry Density (pcf) Percent Moisture (%) Percent Compaction (%) General Location Area:Retaining Wall Moisture Min. (%) Max. Compaction Min. (%) Max. -1 3 95114.9 112.6 Mat. No. Optimum Moisture (%) Max Dry Weight (pcf) Proctor Report No. of 1 Material Information Laboratory Data Project Specifications Grapevine, Texas Project:Mustang Panther Stadium Project Number:F171917 Page Number:1 Technician:Rene Lopez 1/25/2018 Grapevine, TX 76051 Weather:Overcast 349622 Client:Grapevine - Colleyville ISD Service Date:01/22/2018 Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 In-Place Nuclear Density Test Report 30510 Ira E Woods Ave Report Date: Work Order Number: Material Description/Classification Reddish Brown Clayey Sand1 1 SW Retaining Wall of Concession Stand, Station 0+50 FG-4.0 1 6 124.8 125.0 124.8 6 6 124.9 2 SW Retaining Wall of Concession Stand, Station 0+51 FG-4.0 1 6 3 SW Retaining Wall of Concession Stand, Station 0+80 FG-4.0 1 95124.6 108.7 15.0 6 97 108.0 15.6 96 107.3 16.1 5 SW Retaining Wall of Concession Stand, Station 1+30 FG-4.0 1 4 SW Retaining Wall of Concession Stand, Station 0+81 FG-4.0 1 97 107.8 15.8 96 124.7 109.0 14.4 66SW Retaining Wall of Concession Stand, Station 1+31 FG-4.0 1 108.6 15.0 96