Loading...
HomeMy WebLinkAboutAlpha Testing - 1/24/2018 (2)The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office. Based on the representative's visual observation using the provided project plans, the area Cable/Tendon Drape X X X X X Sheathing Proper Support Dowels in Place X X Missing one roll support chairs in middle - Corrected Respectfully Submitted, Remarks: Item Observed Bar Length & Spacing Proper Placement Reinforcement Tied Properly Correct Splicing Grade Reinforcement Number of Reinforcement X X Not Correct Reinforcement Clean Form CleanX approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016) Tim Begole Sr. Grade Beam / Column Size X PT Drawings X Cable/Tendon Count & Spacing • • Geotechnical Engineering | Construction Materials Testing | Environmental Engineering Paving: Repair over New Domestic Waterline A from Station 10+65 to 11+00 The representative utilized the following provided project plans to perform the observation: Drawings Approved Detail Sheet:• Plan Sheet: Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written 01/24/2018Service Date:Client:Grapevine - Colleyville ISD 30510 Ira E Woods Ave Grapevine, TX 76051 Report Date: Weather: F171917 Technician:Billingsley, Ernest (Alan) Project: Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Reinforcing Steel Observation Report Work Order Number: Project Number: C6.1 C6.5 Observation Information X N/ACorrect 4/10/2017 Grapevine, Texas Page Number: 350723 1 of 1 Clear 1/29/2018 Mustang Panther Stadium The representative observed the reinforcing steel related items for the following areas: An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled. X X Size of Reinforcement N/A •Date: X X Stirrup Spacing Not Correct Item Observed Stirrup Size Proper Cover Correct X X X