Loading...
HomeMy WebLinkAboutAlpha Testing - 8/16/2018 (3)1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Dry Dry Dry 17.88 0.50 2.50 16.00 16.20 5.00 2.80 17.50 15.90 Dry Dry N/A N/A N/A N/A N/A N/A Wet Dry Dry Dry Dry N/A N/A N/A N/A N/A 15.30 15.70 15.50 15.10 15.90 3.40 3.30 4.00 N/A N/A N/A N/A 5.00 4.80 N/A N/A N/A 16.70 18.00 18.40 18.70 19.00 19.50 20.10 21.00 19.0020.70 N/A N/A N/AN/A 17.60 N/A N/A N/A N/A N/A N/A 602.73 595.85 600.50 595.92 595.13597.89 602.01 599.19597.31595.40 595.40 595.50 597.21 602.31 601.99598.42 598.53 598.70 599.40 126 9001120119118129 18 18 18 18 128 9003 9002 Client: Condition of Bottom (Wet or Dry) General Contractor: Pier Identification Pier Diameter (in.) Top of Ground Elevation (ft.) Top of Pier Elevation (ft.) Depth of Bearing Stratum From Ground (ft.) Total Depth of Drilled Pier From Ground (ft.) Measured Depth From Ground Level To Top Of Concrete (ft.) Actual Penetration (ft.) Geotechnical Engineering | Construction Materials Testing | Environmental Engineering Project: Drilling Contractor:New Star Drilling 18 598.19 Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Drilled Straight Shaft Pier Observation Report Masonry Fence Post Base 18 601.55 596.35 24 Building/Structure Identification Lee Lewis Casing Diameter (in.) Cased Depth (ft.) 122 24 127 18 Required Penetration (ft.) 128 -1.18 24 24 N/A N/A N/A 0.30 N/A N/A approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016) Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written N/A N/AN/A N/A N/A N/AN/A Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct. N/A N/A N/A N/A N/A N/AN/A N/A N/A N/A N/A Depth From Top Of Concrete To Bottom Of Pier (ft.) N/A 6 6 7 N/A Vertical Bar Size (#)7 7 N/A 17.30 Dry N/A N/A N/A Remarks: N/A 7 N/A N/A N/A 19.00 18 598.42 598.42 N/A 18.50 20.10 Dry N/A 17.80 N/A N/A 0.00 17.80 600.84 600.29 N/A N/A 0.55 N/A N/A -1.60 Dry 123 18 600.50 601.54 7 7 N/A N/A 18.45 Dry N/A N/A N/A -1.04 16.80 Wet 16.80 125 18 597.45 599.05 N/A 124 18 777 6 6 6 6 7 7 7 7 6 6 6 6 7 7 18.25 18.00 18.50Length of Vertical Bars (ft.)17.75 17.90 18.75 6 4 18.00 17.00 19.50 18.00 Number of Vertical Bars (each)6 6 6 6 12 4 4 4 17.75 17.10 18.00 12 4 4 4 12Stirrup Spacing (in.)12 12 12 12 Stirrup Size (#)4 4 4 12 12 12 2:00 PM 2:10 PM 2:20 PM 2:30 PM 12 19.00 17.00 44 12 12 12 12 4 4 4 Time Drilling Was Completed 8:54 AM 9:08 AM 9:22 AM 3:20 PM Time Concrete Was Placed 4:10 PM 4:00 PM 3:45 PM 3:35 PM 10:24 AM 2:05 PM 2:20 PM 2:50 PM1:20 PM 1:40 PM9:45 AM 11:30 AM 11:43 AM 12:02 PM Yes Yes Yes 5:00 PM4:30 PM 4:40 PM Yes Yes YesYesYes Tim Begole Sr. Grapevine, Texas Respectfully Submitted, Yes Yes Yes Yes Yes YesConcrete Placed Same Day (Yes or No) 2:00 PM 4:20 PM 4:50 PM2:35 PM 2:40 PM Yes Mustang Panther Stadium Pkg A & Pkg B Page Number:1of2 Work Order Number: Project Number: Technician: 438930 F171917 Billingsley, Ernest (Alan) Service Date: Report Date: Weather: 08/16/2018 8/21/2018 Partly Cloudy Grapevine - Colleyville ISD 30510 Ira E Woods Ave Grapevine, TX 76051 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Work Order Number:438930 Client:Grapevine - Colleyville ISD Service Date:08/16/2018 Report Date:8/21/2018 Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Drilled Straight Shaft Pier Observation Report Grapevine, TX 76051 Weather:Partly Cloudy 30510 Ira E Woods Ave General Contractor:Lee Lewis Drilling Contractor:New Star Drilling 2 Project:Mustang Panther Stadium Pkg A & Pkg B Project Number:F171917 Technician:Billingsley, Ernest (Alan) Grapevine, Texas Page Number:2of Building/Structure Identification Masonry Fence Post Base Pier Identification 9000 Pier Diameter (in.)18 Top of Pier Elevation (ft.)599.29 Top of Ground Elevation (ft.)598.00 Depth of Bearing Stratum From Ground (ft.)N/A Total Depth of Drilled Pier From Ground (ft.)19.40 Actual Penetration (ft.)N/A Required Penetration (ft.)N/A Measured Depth From Ground Level To Top Of Concrete (ft.)-1.29 Condition of Bottom (Wet or Dry)Wet Depth From Top Of Concrete To Bottom Of Pier (ft.)20.69 Cased Depth (ft.)N/A Casing Diameter (in.)N/A Vertical Bar Size (#)7 Number of Vertical Bars (each)6 Stirrup Size (#)4 Length of Vertical Bars (ft.)17.50 Stirrup Spacing (in.)12 Time Concrete Was Placed 5:15 PM Time Drilling Was Completed 4:00 PM Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct. Remarks: Concrete Placed Same Day (Yes or No)Yes Respectfully Submitted, Geotechnical Engineering | Construction Materials Testing | Environmental Engineering Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016) Tim Begole Sr.