Loading...
HomeMy WebLinkAboutAlpha Testing - 8/9/2018 (2)X Cable/Tendon Drape X X X PT Drawings X Cable/Tendon Count & Spacing X Sheathing X X Grade Beam / Column Size Number of Reinforcement X X X X Proper Cover Proper Support Reinforcement Clean Respectfully Submitted, Missing support chairs at ramp, northside of building B - CorrectedRemarks: approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016) Tim Begole Sr. The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office. 08/09/2018Service Date:Client: Stirrup Spacing Not Correct Item Observed Geotechnical Engineering | Construction Materials Testing | Environmental Engineering Paving: Building B Sidewalks: Building B The representative utilized the following provided project plans to perform the observation: Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written The representative observed the reinforcing steel related items for the following areas: An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled. Observation Information • • •Plan Sheet: Project: Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Reinforcing Steel Observation Report Grapevine - Colleyville ISD 30510 Ira E Woods Ave Grapevine, TX 76051 Mustang Panther Stadium Pkg A & Pkg B Grapevine, Texas Page Number: 436354 1 of 1 Mostly Cloudy 8/20/2018 F171917 Technician:Billingsley, Ernest (Alan) Work Order Number: Project Number: Report Date: Weather: Item Observed Drawings Approved Grade Reinforcement X X Size of Reinforcement Correct Splicing Based on the representative's visual observation using the provided project plans, the area N/A Bar Length & Spacing Proper Placement Reinforcement Tied Properly X was compliant X Stirrup Size Form Clean Dowels in Place •Date: Detail Sheet:• Correct X X X C6.1 L1.1 For legend, C0.5 Paving details 4/10/2017 X N/ACorrectNot Correct