HomeMy WebLinkAboutAlpha Testing - 8/6/2018 (2)Stirrup Spacing
X
PT Drawings X Cable/Tendon Count &
Spacing X
SheathingCable/Tendon Drape X
Form Clean
N/A
Proper Cover
Proper Support
Dowels in Place X
X
X
X
Remarks:
Grade Beam / Column Size X
Tim Begole Sr.
Respectfully Submitted,
Geotechnical Engineering | Construction Materials Testing | Environmental Engineering
Stairs: 50' N to 90' N from SW Corner of Building
The representative utilized the following provided project plans to perform the observation:
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written
Observation Information
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016)
Project:
Alpha Testing, Inc.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.alphatesting.com
TBPE Firm No. 813
Grapevine - Colleyville ISD
30510 Ira E Woods Ave
Grapevine, TX 76051
Report Date:
Weather:
08/06/2018Service Date:
•
Mustang Panther Stadium Pkg A & Pkg B
Client:
The representative observed the reinforcing steel related items for the following area:
Clear
An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Based on the representative's visual observation using the provided project plans, the area was compliant
X
Size of Reinforcement
Grapevine, Texas Page Number:
435221
1 of 1
8/13/2018
F171917
Technician:Jensen, Eric
Reinforcing Steel
Observation Report
Work Order Number:
Project Number:
N/ACorrectNot Correct
X
X
Correct Splicing
Stirrup Size
Drawings Approved
Grade Reinforcement
Number of Reinforcement
X
X
X
Bar Length & Spacing
Proper Placement
Reinforcement Tied Properly
X
X
Item Observed Not Correct Item Observed
Reinforcement Clean
Correct
X
X
X
P23
P23
2/16/2018•Date:
•
Detail Sheet:•
Plan Sheet: