HomeMy WebLinkAboutAlpha Testing - 8/3/2018 (3)C4.9
C6.5
4/10/2017•Date:
Item Observed N/ACorrectNot Correct
X
X
X
Size of Reinforcement
N/A
Bar Length & Spacing
Correct
X
Based on the representative's visual observation using the provided project plans, the area was compliant
X
Grade Reinforcement
Number of Reinforcement
X
X
X
Grapevine, Texas Page Number:
433753
1 of
Reinforcing Steel
Observation Report
Work Order Number:
Project Number:
Report Date:
Weather:
08/03/2018Service Date:Client:
Project:
Alpha Testing, Inc.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.alphatesting.com
TBPE Firm No. 813
Grapevine - Colleyville ISD
30510 Ira E Woods Ave
Grapevine, TX 76051
Mustang Panther Stadium Pkg A & Pkg B
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written
•
•
•
Detail Sheet:•
Plan Sheet:
2
Clear
8/8/2018
The representative observed the reinforcing steel related items for the following area:
An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
F171917
Technician:Guerrero, Victor
X
X
Geotechnical Engineering | Construction Materials Testing | Environmental Engineering
•
Sidewalk: Around Building C, Area 9
Access Ramp: Area 9
Parking Lot Area/Paving Patch connecting to Access Ramp, Area 9
The representative utilized the following provided project plans to perform the observation:
Observation Information
Proper Placement
Reinforcement Tied Properly
X
Drawings Approved
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016)
Missing chairs - Corrected
Respectfully Submitted,
Tim Begole Sr.
Correct Splicing
Remarks:
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Not Correct Item Observed
Stirrup SizeX
Proper Cover
Proper Support
Dowels in Place X
Reinforcement Clean
Form Clean
Grade Beam / Column Size X
Stirrup Spacing
X
X
X
Cable/Tendon Drape X Sheathing X
PT Drawings X Cable/Tendon Count &
Spacing
Tim Begole Sr.
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016)
Geotechnical Engineering | Construction Materials Testing | Environmental Engineering
Respectfully Submitted,
X Sheathing
Remarks:
Correct Splicing X
Cable/Tendon Count &
Spacing
X
Based on the representative's visual observation using the provided project plans, the area was compliant
Cable/Tendon Drape
XPT Drawings X
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
XStirrup Size
XGrade Beam / Column Size
XReinforcement Tied Properly X Stirrup Spacing
Proper Placement X
Bar Length & Spacing X
Number of Reinforcement X
Dowels in Place X
Proper Support X
Form Clean X
Grade Reinforcement X Reinforcement Clean X
Size of Reinforcement X
Item Observed CorrectNot Correct N/A Item Observed Correct Not Correct N/A
Proper Cover XDrawings Approved X
•Date:1/15/2018
•Plan Sheet:S6.2
•Detail Sheet:
Observation Information
S7.8 Detail No.11
The representative observed the reinforcing steel related items for the following area:
•Slab on Deck: Level 2
Technician:Guerrero, Victor
Grapevine, Texas
30510 Ira E Woods Ave Report Date:8/8/2018
Page Number:
An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
2 of 2
Project:Mustang Panther Stadium Pkg A & Pkg B Project Number:F171917
Work Order Number:433753
Grapevine, TX 76051 Weather:Clear
Client:Grapevine - Colleyville ISD Service Date:08/03/2018
Alpha Testing, Inc.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.alphatesting.com
TBPE Firm No. 813
Reinforcing Steel
Observation Report