Loading...
HomeMy WebLinkAboutAlpha Testing - 7/20/2018•Plan Sheet:Sheet - P19 / Sheet RW1.5 2/RW1.5 / Detail 1 & 2 4/30/2018 / 4/10/2017 X Correct X X X • • X Size of Reinforcement Correct Splicing Based on the representative's visual observation using the provided project plans, the area Bar Length & Spacing Proper Placement Reinforcement Tied Properly X was compliant X •Date: Detail Sheet:• F171917 Technician:Linan, Carlos Work Order Number: Project Number: Report Date: Weather: Project: Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Reinforcing Steel Observation Report The representative observed the reinforcing steel related items for the following areas: An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled. Grapevine - Colleyville ISD 30510 Ira E Woods Ave Grapevine, TX 76051 Mustang Panther Stadium Pkg A & Pkg B Grapevine, Texas Page Number: 427269 1 of 1 Clear Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office. 07/20/2018Service Date:Client: Stirrup Spacing Not Correct Item Observed N/A Drawings Approved Grade Reinforcement Number of Reinforcement 7/31/2018 Geotechnical Engineering | Construction Materials Testing | Environmental Engineering Wall 9A: NW side of Stadium Footings: Wall 16 at SW Side of Stadium The representative utilized the following provided project plans to perform the observation: Observation Information X X approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016) Respectfully Submitted, Tim Begole Sr. Correct Not Correct Reinforcement Clean N/A Incorrect bar spacing at station 04+00.00 - Corrected; Trash in forms - CorrectedRemarks: X Stirrup Size Form Clean Dowels in Place Item Observed X X Proper Cover Proper Support X X X Cable/Tendon Count & Spacing X Grade Beam / Column Size Cable/Tendon Drape X X PT Drawings X X Sheathing