Loading...
HomeMy WebLinkAboutAlpha Testing - 7/19/2018 (2)approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016) Geotechnical Engineering | Construction Materials Testing | Environmental Engineering This report is in general compliance with one or more of the following technical standards: D6938-15 Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written Respectfully Submitted, Remarks: Tim Begole Sr. 127.8 (M):640Standard Count: Gauge Information Non-compliant results are indicated by an asterisk(*) if applicable. 98 (D):1989 FG-6.0 Model:3430Serial No:33700 Manufacturer:Troxler 95 Wet Density (pcf) Dry Density (pcf) Probe Depth (in.) Percent Moisture (%) Percent Compaction (%) General Location Area:Building C Ramp Field Test Data Test No.Test Location Lift/ Depth Mat. No. -1 3Reddish Brown Clayey Sand Mat. No. Optimum Moisture (%) Max Dry Weight (pcf) Proctor Report No. 1 14.9 Material Description/Classification F171917 Work Order Number:426755 7/31/2018 Grapevine, TX 76051 Weather: Mustang Panther Stadium Pkg A & Pkg B Project Number: Technician:Crawford, Ron of Project Specifications Moisture Min. (%) Max. Compaction Min. (%) Max. Grapevine, Texas Page Number:1 112.6 30510 Ira E Woods Ave Report Date: 1 40' N and 10' W from SW Corner of Building C Ramp 1 6 1 Material Information Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 In-Place Nuclear Density Test Report Client:Grapevine - Colleyville ISD Project: Service Date:07/19/2018 Clear Laboratory Data 1 110.5 109.4 15.7 127.1 110.0 15.5 126.7 109.7 15.5 97 97126.1 126.1 98 97 15.3 109.5 15.2 6238' N and 10' W from SW Corner of Building C Ramp FG-5.0 1 6335' N and 10' W from SW Corner of Building C Ramp FG-4.0 1 6 4 30' N and 10' W from SW Corner of Building C Ramp FG-3.0 1 6 5 25' N and 10' W from SW Corner of Building C Ramp FG-2.0 1