Loading...
HomeMy WebLinkAboutAlpha Testing - 7/10/2018 (2)X PT Drawings X Cable/Tendon Count & Spacing X SheathingCable/Tendon Drape X RW1.3; RW 1.12 RW1.12; RW1.4 1/17/2018 Stirrup Spacing Not Correct Item Observed Stirrup Size Item Observed •Date: X X Respectfully Submitted, approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016) Tim Begole Sr. Geotechnical Engineering | Construction Materials Testing | Environmental Engineering Footings for Wall 9A: Stations 3+30 to 4+55.75 The representative utilized the following provided project plans to perform the observation: Report Date: Weather: Remarks: Drawings Approved Grade Reinforcement Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written The representative observed the reinforcing steel related items for the following area: An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled. Observation Information • Reinforcing Steel Observation Report Work Order Number: Project Number:Mustang Panther Stadium Pkg A & Pkg B Detail Sheet:• Plan Sheet: Project: Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Grapevine - Colleyville ISD 30510 Ira E Woods Ave Service Date:Client: Grapevine, Texas Page Number: 422003 1 of Grapevine, TX 76051 • 07/10/2018 1 Partly Cloudy 7/20/2018 X X Correct X X F171917 Technician:Gasigwa, Ignace(Baziga) N/A Correct Not Correct Reinforcement Clean Form Clean N/A Number of Reinforcement X X Bar Length & Spacing The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office. Grade Beam / Column Size Proper Cover Proper Support X X Size of Reinforcement Correct Splicing Based on the representative's visual observation using the provided project plans, the area was compliant X Proper Placement Reinforcement Tied Properly X Dowels in Place X X X X