HomeMy WebLinkAboutAlpha Testing - 7/10/2018 (2)X
PT Drawings X Cable/Tendon Count &
Spacing X
SheathingCable/Tendon Drape X
RW1.3; RW 1.12
RW1.12; RW1.4
1/17/2018
Stirrup Spacing
Not Correct Item Observed
Stirrup Size
Item Observed
•Date:
X
X
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016)
Tim Begole Sr.
Geotechnical Engineering | Construction Materials Testing | Environmental Engineering
Footings for Wall 9A: Stations 3+30 to 4+55.75
The representative utilized the following provided project plans to perform the observation:
Report Date:
Weather:
Remarks:
Drawings Approved
Grade Reinforcement
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written
The representative observed the reinforcing steel related items for the following area:
An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Observation Information
•
Reinforcing Steel
Observation Report
Work Order Number:
Project Number:Mustang Panther Stadium Pkg A & Pkg B
Detail Sheet:•
Plan Sheet:
Project:
Alpha Testing, Inc.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.alphatesting.com
TBPE Firm No. 813
Grapevine - Colleyville ISD
30510 Ira E Woods Ave
Service Date:Client:
Grapevine, Texas Page Number:
422003
1 of
Grapevine, TX 76051
•
07/10/2018
1
Partly Cloudy
7/20/2018
X
X
Correct
X
X
F171917
Technician:Gasigwa, Ignace(Baziga)
N/A Correct Not Correct
Reinforcement Clean
Form Clean
N/A
Number of Reinforcement
X
X
Bar Length & Spacing
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Grade Beam / Column Size
Proper Cover
Proper Support
X
X
Size of Reinforcement
Correct Splicing
Based on the representative's visual observation using the provided project plans, the area was compliant
X
Proper Placement
Reinforcement Tied Properly
X
Dowels in Place X
X
X
X