Loading...
HomeMy WebLinkAboutAlpha Testing - 6/25/2018PT Drawings X X X XX RW 1.1; RW 1.8 / C3.6, C3.9 RW1.4; RW 1.6; RW 1.8 / RW1.21 5/17/2017 / 10/16/2018•Date: Proper Cover Item Observed N/ACorrectNot CorrectCorrectN/ANot Correct Item Observed 06/25/2018 Reinforcing Steel Observation Report Work Order Number: Report Date: Weather: Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Grapevine - Colleyville ISD 30510 Ira E Woods Ave 415565 Service Date: 6/28/2018 The representative utilized the following provided project plans to perform the observation: Grapevine, TX 76051 Size of Reinforcement Client: Plan Sheet: Project: Correct Splicing Reinforcement Clean Technician:Gasigwa, Ignace(Baziga) Grapevine, Texas Page Number:1 of Stirrup Spacing Based on the representative's visual observation using the provided project plans, the area was compliant • • The representative observed the reinforcing steel related items for the following area: An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled. 1 Footing for Wall 2 Station 0+00 to 01+00 Cloudy Mustang Panther Stadium Pkg A & Pkg B Project Number:F171917 Slab at Video Camera Location: Adjacent to Retaining Wall 6 and Adjacent to Retaining Wall 1 • Detail Sheet:• Observation Information Drawings Approved Grade Beam / Column Size X Proper Placement Reinforcement Tied Properly X Grade Reinforcement Number of Reinforcement X X Geotechnical Engineering | Construction Materials Testing | Environmental Engineering Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016) Tim Begole Sr. Respectfully Submitted, Remarks: The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office. XCable/Tendon Drape Sheathing Stirrup Size X X X X Bar Length & Spacing X X X X Proper Support Dowels in Place Form Clean X Cable/Tendon Count & Spacing X