Loading...
HomeMy WebLinkAboutAlpha Testing - 5/30/2018 (3)The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office. Form Clean Grade Beam / Column Size Remarks: Stirrup Size Bar Length & Spacing Proper Placement Reinforcement Tied Properly X X X X Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written Observation Information Respectfully Submitted, Drawings Approved Grade Reinforcement Number of Reinforcement X X Geotechnical Engineering | Construction Materials Testing | Environmental Engineering Footing for Wall 9A: Stations 2+70 to 3+30 Footing for Camera Base Walls The representative utilized the following provided project plans to perform the observation: Stirrup Spacing X X Cable/Tendon Count & Spacing approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016) Tim Begole Sr. Client: The representative observed the reinforcing steel related items for the following area: Project: Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Grapevine - Colleyville ISD 30510 Ira E Woods Ave Grapevine, TX 76051 An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled. Grapevine, Texas Page Number: 403754 1 of Reinforcing Steel Observation Report Work Order Number: Project Number: Report Date: Weather: 05/30/2018Service Date: Mustang Panther Stadium Pkg A & Pkg B Clear 6/4/2018 Dowels in Place X F171917 Technician:Gasigwa, Ignace(Baziga) Correct Splicing Based on the representative's visual observation using the provided project plans, the area was compliant PT Drawings 1 • • X X X X Cable/Tendon Drape X Sheathing X Not Correct Item Observed Reinforcement Clean Plan Sheet: X X RW1.12 / C3.6, C3.9 RW1.3 / RW1.21 5/17/2017 / 10/16/2018•Date: • Detail Sheet:• X X Item Observed Size of Reinforcement N/A Proper Cover Proper Support Correct X N/ACorrectNot Correct