HomeMy WebLinkAboutAlpha Testing - 5/30/2018 (3)The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Form Clean
Grade Beam / Column Size
Remarks:
Stirrup Size
Bar Length & Spacing
Proper Placement
Reinforcement Tied Properly
X
X
X
X
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written
Observation Information
Respectfully Submitted,
Drawings Approved
Grade Reinforcement
Number of Reinforcement
X
X
Geotechnical Engineering | Construction Materials Testing | Environmental Engineering
Footing for Wall 9A: Stations 2+70 to 3+30
Footing for Camera Base Walls
The representative utilized the following provided project plans to perform the observation:
Stirrup Spacing
X
X Cable/Tendon Count &
Spacing
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016)
Tim Begole Sr.
Client:
The representative observed the reinforcing steel related items for the following area:
Project:
Alpha Testing, Inc.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.alphatesting.com
TBPE Firm No. 813
Grapevine - Colleyville ISD
30510 Ira E Woods Ave
Grapevine, TX 76051
An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Grapevine, Texas Page Number:
403754
1 of
Reinforcing Steel
Observation Report
Work Order Number:
Project Number:
Report Date:
Weather:
05/30/2018Service Date:
Mustang Panther Stadium Pkg A & Pkg B
Clear
6/4/2018
Dowels in Place
X
F171917
Technician:Gasigwa, Ignace(Baziga)
Correct Splicing
Based on the representative's visual observation using the provided project plans, the area was compliant
PT Drawings
1
•
•
X
X X
X
Cable/Tendon Drape X Sheathing
X
Not Correct Item Observed
Reinforcement Clean
Plan Sheet:
X
X
RW1.12 / C3.6, C3.9
RW1.3 / RW1.21
5/17/2017 / 10/16/2018•Date:
•
Detail Sheet:•
X
X
Item Observed
Size of Reinforcement
N/A
Proper Cover
Proper Support
Correct
X
N/ACorrectNot Correct