Loading...
HomeMy WebLinkAboutAlpha Testing - 5/24/2018 (2)Geotechnical Engineering | Construction Materials Testing | Environmental Engineering This report is in general compliance with one or more of the following technical standards: D6938-15 Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written Tim Begole Sr. approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016) Respectfully Submitted, 675 Remarks: Standard Count:(D):2493 (M):Serial No:32453 Manufacturer:Troxler Model:3430 Gauge Information Non-compliant results are indicated by an asterisk(*) if applicable. 97 96 126.9 122.5 Percent Compaction (%) General Location Area:Retaining Wall Backfill Field Test Data Test No.Test Location Lift/ Depth Wet Density (pcf) Dry Density (pcf) Percent Moisture (%) Mat. No. Probe Depth (in.) 16.7 107.1 -13Brown and Tan Sandy Clay Proctor Report No. 98 953 Optimum Moisture (%) Max Dry Weight (pcf) Mat. No. Moisture Min. (%) Max. 2 15.8 2 6 934Brown Sandy Clay 1 of Project:Mustang Panther Stadium Pkg A & Pkg B Project Number:F171917 Technician:Gasigwa, Ignace(Baziga) 1 Material Information Laboratory Data Project Specifications Grapevine, Texas Page Number: Compaction Min. (%) Max.Material Description/Classification 1 Grapevine, TX 76051 101.5 20.9 105.7 20.1 109.1 5/29/2018 Client:Grapevine - Colleyville ISD Service Date:05/24/2018 Weather:Partly Cloudy Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 In-Place Nuclear Density Test Report Work Order Number:401729 30510 Ira E Woods Ave Report Date: 101.9 102.3 FG-0.5 2 6 7 Retaining Wall 6 Backfill Station 0+20 FG-0.5 2 5 Retaining Wall 5 Backfill Station 0+80 FG-0.5 1 6 Retaining Wall 5 Backfill Station 0+80 122.7 6 6 4 Retaining Wall 5 Backfill Station 0+55 FG 1 6 6 123.6 123.1 123.5 FG 1 FG 1 6 6 122.8 122.6 FG-0.5 1 2 6 9 Retaining Wall 6 Backfill Station 0+60 122.6 104.1 103.1 105.2 6 17.81Retaining Wall 5 Backfill Station 0+20 FG-0.5 1 2 Retaining Wall 5 Backfill Station0+20 3 Retaining Wall 5 Backfill Station 0+55 12 Retaining Wall 6 Backfill Station 1+20 FG 2 6 11 Retaining Wall 6 Backfill Station 1+20 10 Retaining Wall 6 Backfill Station 0+60 FG 2 104.2 18.1 124.8 6 6 126.9 FG-0.5 2 8 Retaining Wall 6 Backfill Station 0+20 FG 20.4 97 20.2 16.5 98 93 94 21.4 19.1 97 97 93 122.2 102.3 102.8 104.7 19.5 96 20.8 9818.0 94 105.4