HomeMy WebLinkAboutAlpha Testing - 5/21/2018 (2)Cable/Tendon Drape X
X
X
Sheathing X
X Cable/Tendon Count &
Spacing X
XGrade Reinforcement
Proper Cover
Proper Support
Number of Reinforcement
X
X
Stirrup Spacing
PT Drawings
Remarks:
Respectfully Submitted,
XX
X
Stirrup Size
X
Form Clean
Reinforcement Tied Properly
X
Dowels in Place
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Tim Begole Sr.
05/21/2018
Geotechnical Engineering | Construction Materials Testing | Environmental Engineering
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written
The representative observed the reinforcing steel related items for the following areas:
An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Observation Information
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016)
Bar Length & Spacing
Proper Placement
Grapevine, Texas Page Number:
399819
1 of
Project:
Alpha Testing, Inc.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.alphatesting.com
TBPE Firm No. 813
Reinforcing Steel
Observation Report
Report Date:
Weather:
Work Order Number:
Service Date:Grapevine - Colleyville ISD
30510 Ira E Woods Ave
Grapevine, TX 76051
Client:
Mustang Panther Stadium Pkg A & Pkg B
Not CorrectNot Correct Item Observed
F171917
Technician:Gasigwa, Ignace(Baziga)
Project Number:
X
X
Size of Reinforcement
N/A
X
Reinforcement Clean
Correct Splicing
Based on the representative's visual observation using the provided project plans, the area was compliant
XGrade Beam / Column Size
1
Cloudy
5/23/2018
X
Bleacher Steps: G.2/3 to G.2/0.9
Item Observed
Drawings Approved
•Date:
Correct
•
•
Detail Sheet:•
Plan Sheet:
X
RW 1.7
RW 1.8
9/15/2017
N/ACorrect