HomeMy WebLinkAboutAlpha Testing - 5/16/2018 (3)X X Size of Reinforcement N/A Bar Length & Spacing Proper Placement Reinforcement Tied Properly X Project: Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Reinforcing Steel Observation Report 1 Mostly Cloudy 5/18/2018 Work Order Number: Project Number: Report Date: F171917 Technician:Gasigwa, Ignace(Baziga) Grapevine, Texas Page Number: 398151 1 The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office. 05/16/2018Grapevine - Colleyville ISD 30510 Ira E Woods Ave Grapevine, TX 76051 Service Date:Client: The representative observed the reinforcing steel related items for the following area: An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled. Weather: Mustang Panther Stadium Pkg A & Pkg B of Geotechnical Engineering | Construction Materials Testing | Environmental Engineering The representative utilized the following provided project plans to perform the observation: approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016) Observation Information Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written Tim Begole Sr. Remarks: Correct X X X Respectfully Submitted, N/A Stirrup Size Correct Splicing Based on the representative's visual observation using the provided project plans, the area was compliant X Bleacher Steps: G.2/8 to G.2/3 RW 1.7 RW 1.8 9/15/2017 Not Correct Item ObservedItem Observed • X X • Detail Sheet:• Plan Sheet: Drawings Approved Correct •Date: X X Grade Reinforcement Number of Reinforcement X Not Correct Reinforcement Clean Form Clean Proper Support Dowels in Place Stirrup Spacing Proper Cover X X X Grade Beam / Column Size X X Cable/Tendon Drape X Sheathing X PT Drawings X Cable/Tendon Count & Spacing