HomeMy WebLinkAboutAlpha Testing - 4/6/2018 (3)•Plan Sheet:RW1.13
RW1.6
5/17/2017
x
Correct
x
x
x
Project Number:
Report Date:
Weather:
•
•
x
x
Size of Reinforcement
Correct Splicing
Based on the representative's visual observation using the provided project plans, the area
Bar Length & Spacing
Proper Placement
Reinforcement Tied Properly
x
was compliant
x
•
Project:
Alpha Testing, Inc.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.alphatesting.com
TBPE Firm No. 813
Reinforcing Steel
Observation Report
The representative observed the reinforcing steel related items for the following area(s):
An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Grapevine - Colleyville ISD
30510 Ira E Woods Ave
Grapevine, TX 76051
Mustang Panther Stadium Pkg A & Pkg B
Grapevine, Texas Page Number:
380392
1 of 1
Partly Cloudy
04/06/2018Service Date:Client:
Stirrup Spacing
Not Correct Item Observed
Drawings Approved
Grade Reinforcement
Number of Reinforcement
4/11/2018
F171917
Technician:Gasigwa, Ignace(Baziga)
Work Order Number:
Retaining Wall Footings Sta.1+50 to Sta. 2+70
The representative utilized the following provided project plans to perform the observation:
Observation Information
x
x
Tim Begole Sr.
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Geotechnical Engineering | Construction Materials Testing | Environmental Engineering
•
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016)Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written
Date:
Detail Sheet:•
Stirrup Size
Form Clean
Dowels in Place
Item Observed
Respectfully Submitted,
Sta. 1+50 to Sta. 2+10: #8 bars were used in place of #6 barsRemarks:
N/ACorrectNot Correct
Reinforcement Clean
N/A
x
x
Proper Cover
Proper Support
x
x
x
x
Cable/Tendon Count &
Spacing x
Grade Beam / Column Size
Cable/Tendon Drape
x
PT Drawings x
x Sheathing
•Plan Sheet:S2.3
S3.5
1/15/2018
x
Correct
x
x
x
Project Number:
Report Date:
Weather:
•
•
x
x
Size of Reinforcement
Correct Splicing
Based on the representative's visual observation using the provided project plans, the area
Bar Length & Spacing
Proper Placement
Reinforcement Tied Properly
x
was compliant
x
•
Project:
Alpha Testing, Inc.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.alphatesting.com
TBPE Firm No. 813
Reinforcing Steel
Observation Report
The representative observed the reinforcing steel related items for the following area(s):
An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Grapevine - Colleyville ISD
30510 Ira E Woods Ave
Grapevine, TX 76051
Mustang Panther Stadium Pkg A & Pkg B
Grapevine, Texas Page Number:
380394
1 of 1
Partly Cloudy
04/06/2018Service Date:Client:
Stirrup Spacing
Not Correct Item Observed
Drawings Approved
Grade Reinforcement
Number of Reinforcement
04/06/2018
F171917
Technician:Gasigwa, Ignace(Baziga)
Work Order Number:
Wall: G.2/11.2-G.2/11.0
The representative utilized the following provided project plans to perform the observation:
Technician:
Observation Information
Gasigwa, Ignace(Baziga)
x
x
Draft
Version 1.2
Lunch Hrs:Tim Begole Sr.
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Total Hrs:
Geotechnical Engineering | Construction Materials Testing | Environmental Engineering
•
Date: 4/18/17
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016)
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written
Date:
Detail Sheet:•
Stirrup Size
Form Clean
Dowels in Place
Item Observed
Respectfully Submitted,
Start Time:
Remarks:
Stop Time:
N/ACorrectNot Correct
Reinforcement Clean
N/A
x
x
Proper Cover
Proper Support
x
x
x
x
x
Cable/Tendon Count &
Spacing x
Grade Beam / Column Size
Cable/Tendon Drape
PT Drawings x
x Sheathing
Reinforcing Steel
Observation Report
Grapevine, TX 76051
Mustang Panther Stadium Pkg A & Pkg B
Report Date:
Weather:
Size of Reinforcement
•Plan Sheet:RW1.13 / S2.3
RW1.6 / S3.5•
•
Detail Sheet:
Date:
N/A
The representative utilized the following provided project plans to perform the observation:
X
X
5/17/2017 / 1/15/2018
X
Correct
X
X
Retaining Wall Footings Stations1+50 to 2+70
Wall: G.2/11.2 to G.2/11.0
Stirrup Spacing
Not Correct Item Observed
Drawings Approved
•
•
X
X
Bar Length & Spacing
Proper Placement
Reinforcement Tied Properly
X
X
Client:Grapevine - Colleyville ISD
30510 Ira E Woods Ave 4/11/2018
F171917
Technician:Gasigwa, Ignace(Baziga)
Proper Cover
Proper Support
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Project:
Alpha Testing, Inc.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.alphatesting.com
TBPE Firm No. 813
The representative observed the reinforcing steel related items for the following areas:
An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Grapevine, Texas Page Number:
380392
1 of 1
Work Order Number:
Project Number:
Partly Cloudy
04/06/2018Service Date:
Item Observed Correct
Grade Reinforcement
N/A
was compliant
X
Stirrup Size
Correct Splicing
Based on the representative's visual observation using the provided project plans, the area
X
Observation Information
X
X
Number of Reinforcement
Not Correct
Reinforcement CleanX
Tim Begole Sr.
Form Clean
Dowels in Place X
Geotechnical Engineering | Construction Materials Testing | Environmental Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016)Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written
Remarks:
Respectfully Submitted,
X
Grade Beam / Column Size
Cable/Tendon Count &
Spacing X
X
Cable/Tendon Drape
PT Drawings X
X Sheathing