Loading...
HomeMy WebLinkAboutAlpha Testing - 4/18/2018 (2)Concrete Compression Test Report 5058 Brush Creek Rd. Fort Worth, TX 76119 (817)496-5600 Alpha Testing, Inc. TBPE Firm No. 813 FIELD DATA Placement Location:RETAINING WALL NORTHSIDE OF STADIUM Project Desc:MUSTANG PANTHER STADIUM PKG A & PKG B Our Report #:F171917-162 GRAPEVINE - COLLEYVILLE ISD 30510 IRA E WOODS AVE GRAPEVINE, TX 76051 CALVA POWELLATTN: Fax Number: Date Placed:3/21/2018 Time Placed:9:40 AM 5.5 4.0 59.0 69.0 Date Received:3/26/2018 Concrete Supplier:MARTIN MARIETTA Submitted By:Scott, Clinton Plant Number:131 Delivery Ticket No.:A581975 139.9 Batch Time:8:20:00 AM Tested For: Lab No.: Cure Type: Date Tested: Age (Days): Max Load: Area: Sq. In.PSI: Cap Spec: CYLINDER COMPRESSION TEST RESULTS (ASTM C-231) Avg. Length Avg. Width Avg Depth/ Diameter Cast By:ALPHA Cured Specification:ASTM C-31 Mix ID:8200M Break Type: Sample Location:STATION 00+40 PM:TIM BEGOLE SR. Date Issued:04/18/2018 Specified Strength:3000 Result Air Content: Ambient Temp (F): Concrete Temp (F): Unit Weight: Slump (ASTM C-143): 281 3/28/2018 7 3842012.56 3060LABC-1231 8 N/A 41 282 4/18/2018 28 4682012.56 3730LABC-1231 8 N/A 41 283 4/18/2018 28 4848012.56 3860LABC-1231 8 N/A 42 284 5/16/2018 56 012.56LABC-1231 8 N/A 4 Average 28-day Compressive Strength is compliant with project specifications CC: 3800 Respectfully Submitted By:__________________________________________________________ of Alpha Testing, Inc. Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 312319 Break Types: 1: Cone 2: Cone and Split 3: Cone and Shear 4: Shear 5: Columnar * = Specification out of spec Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.