Size of Reinforcement
Correct Splicing
Based on the representative's visual observation using the provided project plans, the area
Bar Length & Spacing
X
X
X
was compliant
X
Stirrup Size
Form Clean
Abima, Cornelius
Project Number:
Clear
3/19/2018Report Date:
Weather:
Item Observed N/A
•Date:
Detail Sheet:•
Correct
RW1.5 / S3.3 , S2.1
2 / (5,6,8,9,12), Grade Beam Schedule
5/17/2017 / 9/13/2017, 9/15/2017
N/ACorrectNot Correct
Project:
Alpha Testing, Inc.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.alphatesting.com
TBPE Firm No. 813
Reinforcing Steel
Observation Report
Grapevine - Colleyville ISD
30510 Ira E Woods Ave
Grapevine, TX 76051
Work Order Number:
Mustang Panther Stadium Pkg A & Pkg B
Geotechnical Engineering | Construction Materials Testing | Environmental Engineering
Retaining Wall 7, Building B footing
Press Box grade beams
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written
Observation Information
•
•
•Plan Sheet:
Drawings Approved
Grade Reinforcement
Proper Placement
Reinforcement Tied Properly
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
03/12/2018Service Date:Client:
Stirrup Spacing
Not Correct Item Observed
The representative observed the reinforcing steel related items for the following areas:
An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Grapevine, Texas Page Number:
369602
1 of 1
F171917
Technician:
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016)
Tim Begole Sr.
Respectfully Submitted,
Grade Beam: Press Box (Void boxes were not used per detail due to the presence of water in the ground)Remarks:
Number of Reinforcement
X
X
X
X
X
Dowels in Place
XReinforcement Clean
Grade Beam / Column Size
Proper Cover
Proper Support
X
X
X
X
X
X
X
Cable/Tendon Count &
Spacing X
Cable/Tendon Drape
X
X
PT Drawings X
X Sheathing