HomeMy WebLinkAboutAlpha Testing - 2/13/20181 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Grapevine - Colleyville ISD 30510 Ira E Woods Ave Grapevine, TX 76051 Service Date: Report Date: Weather: 02/13/2018 2/19/2018 Cloudy Concrete Placed Same Day (Yes or No) Work Order Number: Project Number: Technician: 359973 F171917 Abima, Cornelius 1of1 Yes Yes Yes Yes 1:50 PM 4:30 PM 3:20 PM Yes Yes Yes Yes 12:05 PM 12:30 PM 1:05 PM 1:45 PM 12 4 4:40 PM Stirrup Size (#)4 4 4 Stirrup Spacing (in.)12 12 12 Time Concrete Was Placed 11:45 AM 12:00 PM 12:30 PM 4:45 PM 10:55 AMTime Drilling Was Completed 8:30 AM 9:05 AM 9:35 AM 9 12 4 4 4 12 12 12 Length of Vertical Bars (ft.)44.70 45.00 45.00 13 13 4 47.00 43.00 43.00 43.0043.00 36 107.00 105.50 36 107.00 97.50 88 17.00 N/A 15.00 15.60 15.00 15.00 1.501.50 43.20 Dry N/AN/A N/A N/A Dry 43.50 33.0042.50 Dry 33.50 Dry 37.60 Dry 32.9033.70 13 N/A N/A N/A Vertical Bar Size (#)8 8 N/A N/A N/A Number of Vertical Bars (each)9 Required Penetration (ft.) PC24 18 26.00 17.00 PC18PC49 36 107.00 105.50 15.00 47.10 17.00 17.10 17.00 17.00 PC45 was supposed to be 18 inches in diameter. Driller used a 30 inch auger . They were notified of the error as they continued to drill. Pier completed as a 30". approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016) Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written Remarks: Respectfully Submitted, Tim Begole Sr. Casing Diameter (in.) Cased Depth (ft.) PC45 N/A Depth From Top Of Concrete To Bottom Of Pier (ft.) PC21 17.20 9.509.50Measured Depth From Ground Level To Top Of Concrete (ft.) Actual Penetration (ft.) N/A 13 13 8 888 13 Page Number: Mustang Panther Stadium Renovation 36 107.00 107.00 36 36 PC19PC47 107.00 General Contractor: Pier Identification Pier Diameter (in.) Top of Ground Elevation (ft.) Top of Pier Elevation (ft.) Depth of Bearing Stratum From Ground (ft.) Geotechnical Engineering | Construction Materials Testing | Environmental Engineering Project: Drilling Contractor: Client: Condition of Bottom (Wet or Dry) Wylie DrillingLee Lewis Construction Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Drilled Straight Shaft Pier Observation Report Grapevine, Texas Mustang Panther Stadium Pkg A & Pkg B Building/Structure Identification 36 107.00 43.00 105.50 97.5097.50 30.00 97.5097.50 PC22 Total Depth of Drilled Pier From Ground (ft.) 107.00 45.00 42.50 42.40 30.00 25.40 25.00 44.70 44.00 26.0029.0029.10 43.20 17.00 15.00 17.10 17.40 9.501.50 9.50 9.50 Dry Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct. N/A N/A N/A Dry Dry