Loading...
HomeMy WebLinkAboutAlpha Testing - 2/14/20181 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 15.00 9.50 9.50 9.00 9.00 28.50 34.50 15.00 16.10 16.10 15.90 Dry 10.20 15.00 40.90 26.00 98.00 98.0096.80 25.00 24.30 25.00 41.10 40.4038.00 Building/Structure Identification 24 24 Wylie DrillingLee Lewis Construction Mustang Panther Stadium Renovation PC54PC50 General Contractor: PB45 PB46 Project: Client: Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Drilled Straight Shaft Pier Observation Report Grapevine, Texas Mustang Panther Stadium Pkg A & Pkg B Page Number: 360470 Grapevine - Colleyville ISD 24 Top of Ground Elevation (ft.) Top of Pier Elevation (ft.) Depth of Bearing Stratum From Ground (ft.) Geotechnical Engineering | Construction Materials Testing | Environmental Engineering Condition of Bottom (Wet or Dry) 107.00 41.20 97.50 97.5096.80 107.00 107.00 Total Depth of Drilled Pier From Ground (ft.) Casing Diameter (in.) Cased Depth (ft.) PC16 N/A 6 6 15.00 10.206.50 Dry 31.60 N/A Pier Identification Pier Diameter (in.) Drilling Contractor: N/A 6 Respectfully Submitted, Depth From Top Of Concrete To Bottom Of Pier (ft.) PB56 Tim Begole Sr. Measured Depth From Ground Level To Top Of Concrete (ft.) Actual Penetration (ft.) 6 8 86 107.00 107.00 approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016) Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written Required Penetration (ft.) PC16 18 23.00 15.00 PB55PC56 18 107.00 100.50 15.00 42.20 15.0015.00 38.00 24 24 107.00 23.00 40.40 41.00 25.1025.0024.00 N/A 8 88 Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct. N/A N/A N/A Number of Vertical Bars (each)6 Per RFI007, piers PB55 and PB56 for straddle beam.Remarks: 6 Vertical Bar Size (#)6 6 N/A 31.40 31.9027.80 Dry N/A Dry N/A N/A N/A N/A N/A N/A N/A N/A Dry Dry DryDry 18 107.00 101.50 18 107.00 100.50 15.00 N/A 15.00 16.40 15.00 16.00 6.505.50 34.90 Dry 34.70 32.00 16.2016.10 Length of Vertical Bars (ft.)38.50 41.20 41.10 12 43 42.00 38.0040.50 4 12:50 PM 4 12 12 12 6 666 40.70 48.90 49.00 12 12 4 3:40 PM 3:30 PM Stirrup Size (#)3 3 3 Stirrup Spacing (in.)12 12 12 11:40 AM 10:20 AMTime Drilling Was Completed 7:50 AM 8:30 AM 9:15 AM Time Concrete Was Placed 12:40 PM 11:35 AM of1 YesYesYesYesYes 1:00 PM 3:25 PM 3:35 PM 11:35 AM 12:20 PM 2:25 PM 3:00 PM Yes YesYesYes 4 Concrete Placed Same Day (Yes or No) Work Order Number: Project Number: Technician: 4:30 PM F171917 Abima, Cornelius 1 30510 Ira E Woods Ave Grapevine, TX 76051 Service Date: Report Date: Weather: 02/14/2018 2/19/2018 Cloudy