Loading...
HomeMy WebLinkAboutAlpha Testing - 2/19/2018Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Cancellation Report Pier MonitoringScheduled Service: 02/19/2018Service Date: Weather: Page Number: Client: Project: Grapevine - Colleyville ISD Too wet to work. 30510 Ira E Woods Ave Grapevine, TX 76051 of 1 Project Number:F171917 Reason for Cancellation: 2/23/2018 Piers Report Date: 362264 Mustang Panther Stadium Pkg A & Pkg B Grapevine, Texas Technician: An Alpha Testing engineering representative traveled to the above referenced project to observe ongoing work and perform field services as scheduled. Cloudy Abima, Cornelius Areas of Work: Geotechnical Engineering | Construction Materials Testing | Environmental Engineering Work Order Number: 1 Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written Remarks: Upon notification of the cancellation, the engineering representative returned to the Fort Worth Office. Time Notified:7:45 approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-003(8/2/2016) Tim Begole Sr. Respectfully Submitted,