Loading...
HomeMy WebLinkAboutAlpha Testing - 4/2/2018Concrete Compression Test Report 5058 Brush Creek Rd. Fort Worth, TX 76119 (817)496-5600 Alpha Testing, Inc. TBPE Firm No. 813 FIELD DATA Placement Location:DRILLED PIERS Project Desc:MUSTANG PANTHER STADIUM PKG A & PKG B Our Report #:F171917-129 GRAPEVINE - COLLEYVILLE ISD 30510 IRA E WOODS AVE GRAPEVINE, TX 76051 CALVA POWELLATTN: Fax Number: Date Placed:3/5/2018 Time Placed:10:45 AM 6.0 1.7 66.0 86.0 Date Received:3/7/2018 Concrete Supplier:MARTIN MARIETTA Submitted By:Abima, Cornelius Plant Number:131 Delivery Ticket No.:4535040 154.8 Batch Time:10:03:00 AM Tested For: Lab No.: Cure Type: Date Tested: Age (Days): Max Load: Area: Sq. In.PSI: Cap Spec: CYLINDER COMPRESSION TEST RESULTS (ASTM C-231) Avg. Length Avg. Width Avg Depth/ Diameter Cast By:ALPHA Cured Specification:ASTM C-31 Mix ID:S3135214 Break Type: Sample Location:PC 37 PM:TIM BEGOLE SR. Date Issued:04/02/2018 Specified Strength:3500 Result Air Content: Ambient Temp (F): Concrete Temp (F): Unit Weight: Slump (ASTM C-143): 210 3/12/2018 7 4224012.56 3360LABC-1231 8 N/A 41 211 4/2/2018 28 5329012.56 4240LABC-1231 8 N/A 45 212 4/2/2018 28 5547012.56 4420LABC-1231 8 N/A 45 213 4/2/2018 28 5362012.56 4270LABC-1231 8 N/A 42 214 HOLD HOLD 012.56LABC-1231 8 N/A 4 Average 28-day Compressive Strength is compliant with project specifications CC: 4310 Respectfully Submitted By:__________________________________________________________ of Alpha Testing, Inc. Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 309754 Break Types: 1: Cone 2: Cone and Split 3: Cone and Shear 4: Shear 5: Columnar * = Specification out of spec Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.