Loading...
HomeMy WebLinkAboutAlpha Testing - 3/7/20181 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct. N/A N/A N/A Dry Dry Dry 1.50 1.50 9.009.00 17.00 17.60 17.20 15.00 17.00 42.40 43.60 42.2042.60 25.40 26.00 25.00 43.40 42.00 42.30 105.50 105.50 98.0098.00 107.00107.00 PC5 36 Client: Condition of Bottom (Wet or Dry) General Contractor: Pier Identification Pier Diameter (in.) Top of Ground Elevation (ft.) Top of Pier Elevation (ft.) Depth of Bearing Stratum From Ground (ft.) Total Depth of Drilled Pier From Ground (ft.) Building/Structure Identification Measured Depth From Ground Level To Top Of Concrete (ft.) Actual Penetration (ft.) Geotechnical Engineering | Construction Materials Testing | Environmental Engineering Project: Drilling Contractor:Wylie T DrillingLee Lewis Construction Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Drilled Straight Shaft Pier Observation Report Mustang Panther Stadium Renovation 54 107.00 107.00 36 Tim Begole Sr. Casing Diameter (in.) Cased Depth (ft.) PC29 approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016) Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written N/A Depth From Top Of Concrete To Bottom Of Pier (ft.) PC2 36 Required Penetration (ft.) PC26 36 25.40 17.00 17.20 9.00 17.00 42.40 17.00 17.10 PC3 Remarks: N/A N/A 13 13 8 N/A Vertical Bar Size (#)8 8 Number of Vertical Bars (each)13 N/A 33.40 Dry N/A N/A N/A N/A N/A N/A 33.60 Dry 40.90 42.10 33.20 107.00 98.00 25.30 PC6 36 107.00 98.00 25.2025.00 PC4 N/A 33.00 Dry N/A 17.00 17.70 17.00 17.00 9.009.00 34.40 Dry PC7 36 107.00 98.00 36 107.00 98.00 25.70 17.00 17.10 9.00 33.30 Dry 888 13 13 8 9 13 8 40.90Length of Vertical Bars (ft.)41.00 43.00 41.90 4 39.50 39.30 44.00 41.00 13 12 4 4 4 12Stirrup Spacing (in.)12 12 12 12 Stirrup Size (#)4 4 4 12 12 1:20 PM 2:55 PM 5:15 PM 5:30 PM 4 Time Drilling Was Completed 7:50 AM 8:30 AM 9:10 AM Time Concrete Was Placed 10:45 AM 9:55 AM 11:30 AM 12:35 PM 10:30 AM 11:15 AM 11:50 AM 1:55 PM 2:30 PM Yes Yes Yes Yes 367462 F171917 Grapevine, Texas Respectfully Submitted, Yes Yes Yes YesConcrete Placed Same Day (Yes or No) Mustang Panther Stadium Pkg A & Pkg B Abima, Cornelius Page Number:1of1 Work Order Number: Project Number: Technician: Service Date: Report Date: Weather: 03/07/2018 3/13/2018 Clear Grapevine - Colleyville ISD 30510 Ira E Woods Ave Grapevine, TX 76051