Loading...
HomeMy WebLinkAboutAlpha Testing - 3/8/20181 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct. N/A N/A Dry Dry 4.20 9.009.00 17.40 16.40 15.00 43.60 43.4041.60 26.20 27.00 43.20 42.10 41.10 102.80 98.0098.80 107.00 Client: Condition of Bottom (Wet or Dry) General Contractor: Pier Identification Pier Diameter (in.) Top of Ground Elevation (ft.) Top of Pier Elevation (ft.) Depth of Bearing Stratum From Ground (ft.) Total Depth of Drilled Pier From Ground (ft.) Building/Structure Identification Measured Depth From Ground Level To Top Of Concrete (ft.) Actual Penetration (ft.) Geotechnical Engineering | Construction Materials Testing | Environmental Engineering Project: Drilling Contractor:Wylie T DrillingLee Lewis Construction Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Drilled Straight Shaft Pier Observation Report Mustang Panther Stadium Renovation 18 107.00 107.00 18 Tim Begole Sr. Casing Diameter (in.) Cased Depth (ft.) PC27 approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016) Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written N/A Depth From Top Of Concrete To Bottom Of Pier (ft.) PC1 54 Required Penetration (ft.) PB42 54 26.60 15.00 15.00 8.20 15.00 41.40 15.00 15.00 PB40 Remarks: N/A N/A 9 6 6 N/A Vertical Bar Size (#)8 8 Number of Vertical Bars (each)9 N/A 32.40 Dry N/A N/A N/A N/A N/A 33.40 Dry 39.40 34.40 107.00 98.00 26.40 PC28 54 107.00 100.20 26.0026.00 PB39 N/A 35.30 Dry N/A 15.00 17.80 15.00 16.10 6.805.50 37.70 Dry PC30 54 107.00 101.50 18 107.00 98.00 25.40 15.00 15.10 9.00 32.10 Dry 886 6 9 6 6 48.50Length of Vertical Bars (ft.)41.50 44.50 41.00 3 48.50 40.50 51.00 9 12 3 4 3 12Stirrup Spacing (in.)12 12 12 12 Stirrup Size (#)4 4 4 12 12:30 PM 4:05 PM 4:10 PM Time Drilling Was Completed 7:40 AM 8:20 AM 9:40 AM Time Concrete Was Placed 12:20 PM 11:00 AM 1:05 PM 12:25 PM 10:30 AM 10:50 AM 11:45 AM 12:35 PM Yes Yes Yes Yes 368113 F171917 Grapevine, Texas Respectfully Submitted, Yes Yes YesConcrete Placed Same Day (Yes or No) Mustang Panther Stadium Pkg A & Pkg B Abima, Cornelius Page Number:1of1 Work Order Number: Project Number: Technician: Service Date: Report Date: Weather: 03/08/2018 3/15/2018 Clear Grapevine - Colleyville ISD 30510 Ira E Woods Ave Grapevine, TX 76051