Loading...
HomeMy WebLinkAboutAlpha Testing - 3/14/2018 (2)1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Grapevine - Colleyville ISD 30510 Ira E Woods Ave Grapevine, TX 76051 Service Date: Report Date: Weather: 03/14/2018 3/19/2018 Clear Concrete Placed Same Day (Yes or No) Work Order Number: Project Number: Technician: 371014 F171917 Abima, Cornelius 1of1 Yes Yes Yes Yes Stirrup Size (#)4 4 4 Stirrup Spacing (in.)12 12 12 Time Concrete Was Placed 2:00 PM 2:30 PM 2:45 PM 4:45 PM 1:15 PMTime Drilling Was Completed 11:10 AM 11:50 AM 12:40 PM 13 9 Length of Vertical Bars (ft.)45.00 45.00 40.50 3 30.10 36 107.00 105.50 18 107.00 97.10 N/A 17.00 17.10 17.00 17.10 9.501.50 43.60 Dry N/A34 43.50 30.70 Dry 20.10 Dry N/A 38 30 Vertical Bar Size (#)8 8 N/A Number of Vertical Bars (each)9 Required Penetration (ft.) 30 PC20 36 107.00 97.50 15.00 8.00 8.00 approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016) Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written Remarks: Respectfully Submitted, Tim Begole Sr. Casing Diameter (in.) Cased Depth (ft.) PC55 Depth From Top Of Concrete To Bottom Of Pier (ft.) 9.90Measured Depth From Ground Level To Top Of Concrete (ft.) Actual Penetration (ft.) 13 6 8 6 Page Number: Mustang Panther Stadium Renovation 107.00 2358PC57 General Contractor: Pier Identification Pier Diameter (in.) Top of Ground Elevation (ft.) Top of Pier Elevation (ft.) Depth of Bearing Stratum From Ground (ft.) Geotechnical Engineering | Construction Materials Testing | Environmental Engineering Project: Drilling Contractor: Client: Condition of Bottom (Wet or Dry) Wylie T DrillingLee Lewis Construction Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Drilled Straight Shaft Pier Observation Report Grapevine, Texas Mustang Panther Stadium Pkg A & Pkg B Building/Structure Identification 30.00 105.50 Total Depth of Drilled Pier From Ground (ft.)45.00 30.00 45.10 40.20 22.0023.1028.00 15.00 1.50 Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct. 30 Dry