Loading...
HomeMy WebLinkAboutAlpha Testing - 3/15/2018 (3)1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct. N/A N/A N/AN/A N/A N/A N/A N/A N/A Dry Dry 20.10 23.10 Dry Dry Dry Dry 19.20 Dry Dry 21.60 N/A N/AN/A N/A N/A N/A Dry Dry 18.70 19.40 9.60 9.90 9.90 9.90 9.90 9.90 9.90 9.90 9.909.90 9.90 9.90 8.00 8.10 8.10 8.20 8.00 9.10 10.00 8.10 8.60 8.00 8.00 8.00 8.008.00 8.00 8.00 8.00 8.00 23.40 31.00 28.40 28.40 28.60 28.60 29.30 31.50 30.00 33.0029.10 97.10 21.00 97.10 97.10 97.10 97.10 21.4021.5020.20 28.50 23.00 20.30 20.30 20.40 20.60 31.10 32.00 30.00 97.10 97.10 107.00 97.1097.10 97.1097.10 107.00107.00 107.00107.00 107.00 107.00 2343 2342 2341 107.00 107.00 18 18 23402344235323592354 18 18 18 18 Client: Condition of Bottom (Wet or Dry) General Contractor: Pier Identification Pier Diameter (in.) Top of Ground Elevation (ft.) Top of Pier Elevation (ft.) Depth of Bearing Stratum From Ground (ft.) Total Depth of Drilled Pier From Ground (ft.) Building/Structure Identification Measured Depth From Ground Level To Top Of Concrete (ft.) Actual Penetration (ft.) Geotechnical Engineering | Construction Materials Testing | Environmental Engineering Project: Drilling Contractor:Wylie T DrillingLee Lewis Construction Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Drilled Straight Shaft Pier Observation Report Mustang Panther Stadium Renovation (Bleachers) 18 107.00 107.00 18 1818 Tim Begole Sr. Casing Diameter (in.) Cased Depth (ft.) 2357 approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016) Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written N/A Depth From Top Of Concrete To Bottom Of Pier (ft.) 2351 18 Required Penetration (ft.) 2352 18 20.20 8.00 8.30 9.90 8.00 31.40 8.00 9.00 2350 Remarks: N/A N/A 6 6 6 N/A Vertical Bar Size (#)6 6 Number of Vertical Bars (each)6 N/A N/A 21.50 Dry N/A N/A N/A N/A N/A N/A N/A 18.60 Dry 21.10 18.50 18.50 18.70 107.00 97.10 22.40 2355 18 107.00 97.10 21.0023.30 2338 N/A 22.10 Dry N/A 8.00 8.10 8.00 8.70 9.909.90 21.20 Dry 2356 18 107.00 97.10 18 107.00 97.10 23.00 8.00 9.00 9.90 20.10 Dry 666 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 31.00 34.00 32.00Length of Vertical Bars (ft.)31.50 31.00 31.50 6 4 31.00 30.00 32.00 33.00 6 6 666 9 4 4 34.00 37.00 9 4 4 4 9Stirrup Spacing (in.)9 9 9 9 Stirrup Size (#)4 4 4 9 9 9 11:25 AM 11:20 AM 12:15 PM 12:20 PM 9 34.00 37.00 44 9 9 9 9 4444 34.00 Time Drilling Was Completed 7:40 AM 8:05 AM 8:25 AM 2:50 PM Time Concrete Was Placed 11:00 AM 11:10 AM 11:15 AM 11:20 AM 8:45 AM 1:45 PM 2:10 PM 2:25 PM11:10 AM 12:07 PM9:10 AM 9:35 AM 9:55 AM 11:30 AM 3:45 PM Yes Yes Yes Yes 4:40 PM3:25 PM 3:30 PM Yes Yes YesYesYes 371521 F171917 Grapevine, Texas Respectfully Submitted, Yes Yes Yes Yes Yes YesConcrete Placed Same Day (Yes or No) 1:30 PM 3:20 PM 3:35 PM12:25 PM Mustang Panther Stadium Pkg A & Pkg B Abima, Cornelius Page Number:1of2 Work Order Number: Project Number: Technician: Service Date: Report Date: Weather: 03/15/2018 3/22/2018 Clear Grapevine - Colleyville ISD 30510 Ira E Woods Ave Grapevine, TX 76051 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016) Geotechnical Engineering | Construction Materials Testing | Environmental Engineering Tim Begole Sr. Respectfully Submitted, Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct. Remarks: Concrete Placed Same Day (Yes or No)Yes Time Concrete Was Placed 4:45 PM Time Drilling Was Completed 3:15 PM Stirrup Spacing (in.)9 Stirrup Size (#)4 Length of Vertical Bars (ft.)34.00 Number of Vertical Bars (each)6 Vertical Bar Size (#)6 Cased Depth (ft.)N/A Casing Diameter (in.)N/A Condition of Bottom (Wet or Dry)Dry Depth From Top Of Concrete To Bottom Of Pier (ft.)20.10 Measured Depth From Ground Level To Top Of Concrete (ft.)9.90 Actual Penetration (ft.)8.00 Required Penetration (ft.)8.00 Total Depth of Drilled Pier From Ground (ft.)30.00 Depth of Bearing Stratum From Ground (ft.)22.00 Top of Pier Elevation (ft.)97.10 Top of Ground Elevation (ft.)107.00 Pier Diameter (in.)18 Pier Identification 2360 of 2Page Number: Building/Structure Identification Mustang Panther Stadium Renovation (Bleachers) General Contractor:Lee Lewis Construction Drilling Contractor:Wylie T Drilling Grapevine, Texas Project:Mustang Panther Stadium Pkg A & Pkg B Project Number:F171917 2 Technician:Abima, Cornelius Work Order Number:371521 Client:Grapevine - Colleyville ISD Service Date:03/15/2018 Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Drilled Straight Shaft Pier Observation Report 30510 Ira E Woods Ave Report Date:3/22/2018 Grapevine, TX 76051 Weather:Clear