Loading...
HomeMy WebLinkAboutAlpha Testing - 3/16/2018 (3)1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct. N/A N/A N/A N/A Dry Dry Dry Dry 9.90 9.70 9.70 9.709.90 8.10 17.40 17.10 17.50 17.00 17.00 17.00 31.10 40.50 39.50 40.5040.40 23.00 23.10 22.40 23.00 31.40 32.10 33.50 97.10 97.30 97.30 97.3097.30 107.00 107.00107.00 PB54 PB53 36 36 Client: Condition of Bottom (Wet or Dry) General Contractor: Pier Identification Pier Diameter (in.) Top of Ground Elevation (ft.) Top of Pier Elevation (ft.) Depth of Bearing Stratum From Ground (ft.) Total Depth of Drilled Pier From Ground (ft.) Building/Structure Identification Measured Depth From Ground Level To Top Of Concrete (ft.) Actual Penetration (ft.) Geotechnical Engineering | Construction Materials Testing | Environmental Engineering Project: Drilling Contractor:Wylie T DrillingLee Lewis Conctruction Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Drilled Straight Shaft Pier Observation Report Mustang-Panther Stadium 36 107.00 107.00 18 Tim Begole Sr. Casing Diameter (in.) Cased Depth (ft.) 2361 approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016) Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written N/A Depth From Top Of Concrete To Bottom Of Pier (ft.) PB51 36 Required Penetration (ft.) PB52 18 23.10 17.00 17.30 9.70 8.00 33.30 8.00 8.20 2365 Remarks: N/A N/A 6 6 6 N/A Vertical Bar Size (#)6 6 Number of Vertical Bars (each)6 N/A 23.40 Dry N/A N/A N/A N/A N/A N/A N/A 30.70 Dry 21.20 30.80 29.80 30.80 107.00 97.10 25.10 2363 18 107.00 97.10 24.3024.00 2364 N/A 22.20 Dry N/A 8.00 8.00 8.00 8.10 9.909.90 21.50 Dry 2362 18 107.00 97.10 18 107.00 97.10 23.40 8.00 9.20 9.90 23.60 Dry 866 6 13 8 13 13 8 8 38.00 42.60Length of Vertical Bars (ft.)36.00 40.00 37.00 4 38.00 41.50 41.00 46.00 6 13 9 4 4 4 9Stirrup Spacing (in.)9 9 9 12 Stirrup Size (#)4 4 4 12 12 12 11:35 AM 1:00 PM 1:05 PM 2:45 PM 4 4 Time Drilling Was Completed 7:40 AM 8:00 AM 8:20 AM Time Concrete Was Placed 11:10 AM 11:15 AM 11:20 AM 11:30 AM 9:00 AM 12:30 PM8:40 AM 10:00 AM 10:25 AM 11:45 AM Yes Yes Yes Yes 372106 F171917 Grapevine, Texas Respectfully Submitted, Yes Yes Yes Yes YesConcrete Placed Same Day (Yes or No) 2:50 PM Mustang Panther Stadium Pkg A & Pkg B Abima, Cornelius Page Number:1of1 Work Order Number: Project Number: Technician: Service Date: Report Date: Weather: 03/16/2018 3/22/2018 Clear Grapevine - Colleyville ISD 30510 Ira E Woods Ave Grapevine, TX 76051