Loading...
HomeMy WebLinkAboutAlpha Testing - 3/19/20181 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Grapevine - Colleyville ISD 30510 Ira E Woods Ave Grapevine, TX 76051 Service Date: Report Date: Weather: 03/19/2018 3/22/2018 Clear Concrete Placed Same Day (Yes or No) Work Order Number: Project Number: Technician: 9:50 AM 12:00 PM 1:00 PM11:45 AM 372600 12:05 PM11:50 AM 11:55 AM Yes Yes Yes F171917 Abima, Cornelius 1of2 Yes Yes 11:47 AM Yes Yes Yes Yes 10:28 AM 10:45 AM 10:30 AM Yes Yes Yes Yes Yes Yes 9:30 AM8:30 AM 8:40 AM 8:55 AM 9:05 AM 10:40 AM10:05 AM 10:15 AM 10:30 AM 12 29.50 28.00 33 12 12 12 3 3 12 12 3333 11:40 AM 9:20 AM Stirrup Size (#)3 3 3 Stirrup Spacing (in.)12 12 12 Time Concrete Was Placed 1:05 PM 10:43 AM 10:40 AM 10:25 AM 8:20 AMTime Drilling Was Completed 7:45 AM 7:55 AM 8:05 AM 12 12 6 6 666 12 3 3 3 12 12 12 Length of Vertical Bars (ft.)26.50 25.00 26.00 6 6 6 3 26.00 27.00 27.00 29.00 29.0026.20 30.00 29.00 29.50 29.00 6 6 6 6 18 107.00 96.80 18 107.00 96.80 6 66 6 6 66 15.00 N/A 15.00 15.00 15.00 15.20 10.2010.20 15.80 Dry N/A N/AN/A N/A N/A N/A Dry 17.00 17.8018.00 Dry 16.10 Dry 16.10 Dry 19.80 20.0017.80 6 N/A N/A N/A Vertical Bar Size (#)6 6 N/A N/A N/A Number of Vertical Bars (each)6 Required Penetration (ft.) PA10 18 12.70 15.00 PA5PA16 18 107.00 96.80 15.00 26.30 15.00 15.20 15.00 15.30 approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016) Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written Remarks: Respectfully Submitted, Tim Begole Sr. Casing Diameter (in.) Cased Depth (ft.) PA6 N/A Depth From Top Of Concrete To Bottom Of Pier (ft.) PA13 15.30 10.2010.20Measured Depth From Ground Level To Top Of Concrete (ft.) Actual Penetration (ft.) 10.20 N/A 6 6 6 666 6 Page Number: West Entry Ticket Booths 18 107.00 107.00 18 181818 PA2PA14 107.00 General Contractor: Pier Identification Pier Diameter (in.) Top of Ground Elevation (ft.) Top of Pier Elevation (ft.) Depth of Bearing Stratum From Ground (ft.) Geotechnical Engineering | Construction Materials Testing | Environmental Engineering Project: Drilling Contractor: Client: Condition of Bottom (Wet or Dry) Wylie T DrillingLee Lewis Construction Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Drilled Straight Shaft Pier Observation Report Grapevine, Texas Mustang Panther Stadium Pkg A & Pkg B Measured Depth From Ground Level To Top Of Concrete (ft.) 18 18 18 18 107.00 26.30 96.80 96.8096.80 11.10 96.80 96.8096.80 PA9PA11PA15PA12PA3PA7PA4PA1 Total Depth of Drilled Pier From Ground (ft.) 107.00 107.00 18 18 107.00107.00 107.00 107.00 107.00 107.00 96.80 96.80 96.80 96.80 28.5028.70 96.80 13.40 13.40 96.80 14.30 13.5014.40 13.00 27.20 28.00 30.00 30.20 29.80 29.70 28.60 29.10 12.00 13.00 15.00 15.10 26.00 28.20 11.0013.0011.00 28.00 15.00 15.00 15.00 15.70 15.00 15.00 15.00 15.00 15.00 10.20 15.20 15.00 15.00 15.10 15.50 15.30 15.10 15.30 15.50 10.20 10.2010.20 Dry Dry 19.60 19.50 10.20 10.20 10.20 10.20 10.20 10.20 Dry Dry 18.50 Dry Dry 18.40 N/A N/AN/A N/A N/A N/A Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct. N/A N/A N/AN/A N/A N/A N/A N/A N/A Dry Dry 18.90 18.30 Dry Dry 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Drilled Straight Shaft Pier Observation Report Client:Grapevine - Colleyville ISD Service Date:03/19/2018 Grapevine, TX 76051 Weather:Clear 30510 Ira E Woods Ave Report Date:3/22/2018 2 Technician:Abima, Cornelius Work Order Number:372600 Project:Mustang Panther Stadium Pkg A & Pkg B Project Number:F171917 General Contractor:Lee Lewis Construction Drilling Contractor: of 2 Measured Depth From Ground Level To Top Of Concrete (ft.)West Entry Ticket Booths Wylie T Drilling Grapevine, Texas Page Number: Pier Identification PA8 Pier Diameter (in.)18 Top of Ground Elevation (ft.)107.00 Top of Pier Elevation (ft.)96.80 Depth of Bearing Stratum From Ground (ft.)13.00 Required Penetration (ft.)15.00 Actual Penetration (ft.)15.00 Total Depth of Drilled Pier From Ground (ft.)28.00 Depth From Top Of Concrete To Bottom Of Pier (ft.)17.80 Condition of Bottom (Wet or Dry)Dry Measured Depth From Ground Level To Top Of Concrete (ft.)10.20 Vertical Bar Size (#)6 Casing Diameter (in.)N/A Cased Depth (ft.)N/A Length of Vertical Bars (ft.)28.00 Number of Vertical Bars (each)6 Stirrup Spacing (in.)12 Stirrup Size (#)3 Time Drilling Was Completed 10:50 AM Time Concrete Was Placed 12:10 PM Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct. Concrete Placed Same Day (Yes or No)Yes Remarks: Respectfully Submitted, Tim Begole Sr. Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016) Geotechnical Engineering | Construction Materials Testing | Environmental Engineering