HomeMy WebLinkAboutAlpha Testing - 4/16/2018 (4)X
Cable/Tendon Drape
X
X
X
X
PT Drawings X Cable/Tendon Count &
Spacing
X Sheathing X
Grade Beam / Column Size
Number of Reinforcement
X
X
X
X
Proper Cover
Proper Support
Reinforcement Clean
Respectfully Submitted,
Remarks:
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016)
Tim Begole Sr.
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
04/16/2018Service Date:Client:
Stirrup Spacing
Not Correct Item Observed
Geotechnical Engineering | Construction Materials Testing | Environmental Engineering
Grade Beam: G.2/1 to G.2/0.2
Wall: F/1 to A/1 to A/4.1
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written
The representative observed the reinforcing steel related items for the following areas:
An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Observation Information
•
•
•Plan Sheet:
Project:
Alpha Testing, Inc.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.alphatesting.com
TBPE Firm No. 813
Reinforcing Steel
Observation Report
Grapevine - Colleyville ISD
30510 Ira E Woods Ave
Grapevine, TX 76051
Mustang Panther Stadium Pkg A & Pkg B
Grapevine, Texas Page Number:
385237
1 of 1
Partly Cloudy
4/23/2018
F171917
Technician:Gasigwa, Ignace(Baziga)
Work Order Number:
Project Number:
Report Date:
Weather:
Item Observed
Drawings Approved
Grade Reinforcement
X
X
Size of Reinforcement
Correct Splicing
Based on the representative's visual observation using the provided project plans, the area
N/A
Bar Length & Spacing
Proper Placement
Reinforcement Tied Properly
X
was compliant
X
Stirrup Size
Form Clean
Dowels in Place
•Date:
Detail Sheet:•
Correct
X
X
X
S2.2; S2.5
S2.1; S3.2; S3.4;S3.5; S5.3
9/15/2017
X
N/ACorrectNot Correct