HomeMy WebLinkAboutAlpha Testing - 5/2/2018 (2)Size of Reinforcement
Correct Splicing
Based on the representative's visual observation using the provided project plans, the area was compliant
XNumber of Reinforcement
X
Proper Placement
Reinforcement Tied Properly
X
X
X
X
Dowels in Place
X
X
05/02/2018
1
Cloudy
5/7/2018
F171917
Correct
X
X
Not Correct N/A
Proper Cover
Technician:Gasigwa, Ignace(Baziga)
N/A Correct
Project:
Alpha Testing, Inc.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.alphatesting.com
TBPE Firm No. 813
An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Grapevine - Colleyville ISD
30510 Ira E Woods Ave
Reinforcing Steel
Observation Report
Work Order Number:
Project Number:
Service Date:Client:
Grapevine, Texas Page Number:
392009
1 of
Grapevine, TX 76051
Report Date:
Weather:
Remarks:
Drawings Approved
Grade Reinforcement
Observation Information
•
Detail Sheet:•
Plan Sheet:
X
Mustang Panther Stadium Pkg A & Pkg B
Reinforcement Clean
Form Clean
X
The representative observed the reinforcing steel related items for the following area:
Geotechnical Engineering | Construction Materials Testing | Environmental Engineering
Westside, Upper Level Cast in Place Walls
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written
•
Bar Length & Spacing
Grade Beam / Column Size
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016)
Tim Begole Sr.
Stirrup Spacing
Stirrup Size
Respectfully Submitted,
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
X
X
•Date:
X
X
Proper Support
S2.3
S5.3
1/15/2018
Not Correct Item ObservedItem Observed
X
PT Drawings X Cable/Tendon Count &
Spacing X
SheathingCable/Tendon Drape X