Loading...
HomeMy WebLinkAboutAlpha Testing - 5/29/2018 (2)Size of Reinforcement Correct Splicing Based on the representative's visual observation using the provided project plans, the area was compliant XNumber of Reinforcement X Proper Placement Reinforcement Tied Properly X X X X Dowels in Place X 05/29/2018 1 Partly Cloudy 5/31/2018 F171917 Correct X X Not Correct N/A Proper Cover Technician:Gasigwa, Ignace(Baziga) N/A Correct Project: Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled. Grapevine - Colleyville ISD 30510 Ira E Woods Ave Reinforcing Steel Observation Report Work Order Number: Project Number: Service Date:Client: Grapevine, Texas Page Number: 402820 1 of Grapevine, TX 76051 Report Date: Weather: Remarks: Drawings Approved Grade Reinforcement Observation Information • Detail Sheet:• Plan Sheet: X Mustang Panther Stadium Pkg A & Pkg B Reinforcement Clean Form Clean X The representative observed the reinforcing steel related items for the following area: Geotechnical Engineering | Construction Materials Testing | Environmental Engineering Westside Cast in Place Wall, Ground Level, E.2/0.6 to E.2/0.11 The representative utilized the following provided project plans to perform the observation: Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written • Bar Length & Spacing Grade Beam / Column Size approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016) Tim Begole Sr. Stirrup Spacing Stirrup Size Respectfully Submitted, The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office. X X X •Date: X X Proper Support S2.5; S4.4 S5.3 1/15/2018 Not Correct Item ObservedItem Observed X PT Drawings X Cable/Tendon Count & Spacing X SheathingCable/Tendon Drape X